Improving Emergency Department radiology transportation time: a successful implementation of lean methodology

被引:27
|
作者
Hitti, Eveline A. [1 ]
El-Eid, Ghada R. [2 ]
Tamim, Hani [2 ]
Saleh, Rana [1 ]
Saliba, Miriam [1 ]
Naffaa, Lena [1 ]
机构
[1] Amer Univ Beirut, Dept Emergency Med, Med Ctr, Beirut, Lebanon
[2] Amer Univ Beirut, Med Ctr, Beirut, Lebanon
来源
关键词
TURNAROUND TIME; ACCESS BLOCK; CARE; IMPACT;
D O I
10.1186/s12913-017-2488-5
中图分类号
R19 [保健组织与事业(卫生事业管理)];
学科分类号
摘要
Background: Emergency Department overcrowding has become a global problem and a growing safety and quality concern. Radiology and laboratory turnaround time, ED boarding and increased ED visits are some of the factors that contribute to ED overcrowding. Lean methods have been used in the ED to address multiple flow challenges from improving door-to-doctor time to reducing length of stay. The objective of this study is to determine the effectiveness of using Lean management methods on improving Emergency Department transportation times for plain radiography. Methods: We performed a before and after study at an academic urban Emergency Department with 49,000 annual visits after implementing a Lean driven intervention. The primary outcome was mean radiology transportation turnaround time (TAT). Secondary outcomes included overall study turnaround time from order processing to preliminary report time as well as ED length of stay. All ED patients undergoing plain radiography 6 months pre-intervention were compared to all ED patients undergoing plain radiography 6 months post-intervention after a 1 month washout period. Results: Post intervention there was a statistically significant decrease in the mean transportation TAT (mean +/- SD: 9.87 min +/- 15.05 versus 22.89 min +/- 22.05, respectively, p-value < 0.0001). In addition, it was found that 71.6% of patients in the post-intervention had transportation TAT <= 10 min, as compared to 32.3% in the pre-intervention period, p-value < 0.0001, with narrower interquartile ranges in the post-intervention period. Similarly, the "study processing to preliminary report time" and the length of stay were lower in the post-intervention as compared to the pre-intervention, (52.50 min +/- 35.43 versus 54.04 min +/- 34.72, p-value = 0.02 and 3.65 h +/- 5.17 versus 4.57 h +/- 10.43, p < 0.0001, respectively), in spite of an increase in the time it took to elease a preliminary report in the post-intervention period. Conclusion: Using Lean change management techniques can be effective in reducing transportation time to plain radiography in the Emergency Department as well as improving process reliability.
引用
收藏
页数:10
相关论文
共 50 条
  • [1] Improving Emergency Department radiology transportation time: a successful implementation of lean methodology
    Eveline A. Hitti
    Ghada R. El-Eid
    Hani Tamim
    Rana Saleh
    Miriam Saliba
    Lena Naffaa
    [J]. BMC Health Services Research, 17
  • [2] Improving Emergency Department Door to Doctor Time and Process Reliability A Successful Implementation of Lean Methodology
    El Sayed, Mazen J.
    El-Eid, Ghada R.
    Saliba, Miriam
    Jabbour, Rima
    Hitti, Eveline A.
    [J]. MEDICINE, 2015, 94 (42) : e1679
  • [3] Project RED-a successful methodology for improving emergency department performance
    Ardagh, Michael W.
    Pitchford, Angela M.
    Esson, Anne
    Manson, Heather
    Dolan, Brian
    [J]. NEW ZEALAND MEDICAL JOURNAL, 2011, 124 (1344) : 54 - 63
  • [4] Methodology to Facilitate Successful Lean Implementation
    Berlec, Tomaz
    Kleindienst, Mario
    Rabitsch, Christian
    Ramsauer, Christian
    [J]. STROJNISKI VESTNIK-JOURNAL OF MECHANICAL ENGINEERING, 2017, 63 (7-8): : 457 - 465
  • [5] Implementation of a Radiology Department as an integral part of an Emergency Department
    Blessing, Kristian Fog Farso
    [J]. ACTA RADIOLOGICA, 2013, 54 (04) : 5 - 5
  • [6] A Lean transportation approach for improving emergency medical operations
    Villarreal, Bernardo
    Garza-Reyes, Jose Arturo
    Granda-Gutierrez, Edgar
    Kumar, Vikas
    Lankenau-Delgado, Samantha
    [J]. PRODUCTION PLANNING & CONTROL, 2018, 29 (11) : 928 - 942
  • [7] Improving Hospital Discharge Time A successful Implementation of Six Sigma Methodology
    El-Eid, Ghada R.
    Kaddoum, Roland
    Tamim, Hani
    Hitti, Eveline A.
    [J]. MEDICINE, 2015, 94 (12)
  • [8] A framework to guide the implementation of lean management in emergency department
    Tiso, Anna
    Crema, Maria
    Verbano, Chiara
    [J]. JOURNAL OF HEALTH ORGANIZATION AND MANAGEMENT, 2021, 35 (09) : 315 - 337
  • [9] Applying lean management to reduce radiology turnaround times for emergency department
    Verbano, Chiara
    Crema, Maria
    [J]. INTERNATIONAL JOURNAL OF HEALTH PLANNING AND MANAGEMENT, 2019, 34 (04): : E1711 - E1722
  • [10] An integrated lean methodology for improving patient flow in an emergency department - case study of a Saudi Arabian hospital
    Al Owad, Ali
    Samaranayake, Premaratne
    Karim, Azharul
    Ahsan, Kazi Badrul
    [J]. PRODUCTION PLANNING & CONTROL, 2018, 29 (13) : 1058 - 1081