The Research and Development of Software Related the General Testing Equipment or System on Energy Supply System of Building

被引:0
|
作者
Zou, Dachao [1 ]
Liu, Yayu [1 ]
Liu, Li [1 ]
Ma, Fei [1 ]
Qu, Shilin [1 ]
机构
[1] Univ Sci & Technol Beijing, ICEET09, Beijing 100083, Peoples R China
关键词
virtual instrument; general test; host computer software; heat pump unit;
D O I
10.1109/ICEET.2009.626
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
The project team apply the design software on virtual instrument terrace to develop the testing equipment and host computer software possessing general function. In the application instance, making the water resource heat pump machine set as the testing object The testing equipment and host computer software cover the physical quantity and parameter required to be tested during the testing procedure. Achieve the signal acquisition, analysis of data and processing through the effective combination of various components. Attaching the general testing equipment and the hardware equipment and debugging the software and hardware system to examine the over-all property of package unit by the project finally. Analyze the testing results and compare with the supplied data, definite the problem required attention during the design of host computer software of general testing equipment on energy supply system of building, basing on the above-mentioned.
引用
收藏
页码:652 / 654
页数:3
相关论文
共 50 条
  • [1] A Study on Software Testing for System Peripheral Equipment
    Hu, Yongxiang
    [J]. 2012 INTERNATIONAL CONFERENCE ON INTELLIGENCE SCIENCE AND INFORMATION ENGINEERING, 2012, 20 : 66 - 68
  • [2] Research on the energy-controlling system for the terminal electric equipment in office building
    Sun, Hongchang
    Zhang, Lv'yuan
    Zhang, Weifang
    Wang, Shengjun
    [J]. 10TH INTERNATIONAL SYMPOSIUM ON HEATING, VENTILATION AND AIR CONDITIONING, ISHVAC2017, 2017, 205 : 281 - 287
  • [3] SOFTWARE DEVELOPMENT AND SYSTEM TESTING TECHNIQUES
    WHITBREAD, M
    [J]. MICROPROCESSORS, 1979, 3 (01): : 15 - 18
  • [4] On the optimal maintenance interval for water supply system in building equipment
    Kajiwara, G
    Horigome, M
    [J]. PSAM 5: PROBABILISTIC SAFETY ASSESSMENT AND MANAGEMENT, VOLS 1-4, 2000, (34): : 1683 - 1690
  • [5] Testing System Development of Outdoor Fitness Equipment
    Zhang, Fan
    Wang, Tianjie
    [J]. FRONTIERS OF MANUFACTURING SCIENCE AND MEASURING TECHNOLOGY II, PTS 1 AND 2, 2012, 503-504 : 1518 - 1521
  • [6] DEVELOPMENT OF STATE SYSTEM FOR TESTING MEASURING EQUIPMENT
    IVLEV, AI
    FURSOV, ND
    [J]. MEASUREMENT TECHNIQUES, 1977, 20 (11) : 1576 - 1583
  • [7] Research on testing vehicular power supply system
    Zhou, YJ
    Gan, L
    Li, YL
    Wei, YM
    [J]. ISTM/2005: 6th International Symposium on Test and Measurement, Vols 1-9, Conference Proceedings, 2005, : 250 - 252
  • [8] Research on the Framework of the Software Development Security Testing System Based on the Attack Mode
    Ma, Ning
    [J]. BASIC & CLINICAL PHARMACOLOGY & TOXICOLOGY, 2020, 126 : 291 - 291
  • [9] Research on integrated support general model for equipment system
    Li Shiying
    Zhang Yanzhong
    Yu Yongli
    Zhang Liu
    Lv Ruiqiang
    [J]. Proceedings of the First International Symposium on Test Automation & Instrumentation, Vols 1 - 3, 2006, : 179 - 182
  • [10] Research on General Remote Monitoring System for Industrial Equipment
    Xu Dongming
    Shu Lisheng
    [J]. ADVANCES IN ENGINEERING DESIGN AND OPTIMIZATION III, PTS 1 AND 2, 2012, 201-202 : 678 - 681