GA-based Model Updating for Existing Bridges

被引:0
|
作者
Kim, J. C. [1 ]
Yoon, J. [2 ]
Shin, S. [2 ]
机构
[1] Byucksan Engn, Seoul, South Korea
[2] Inha Univ, Incheon, South Korea
来源
MAINTENANCE, SAFETY, RISK, MANAGEMENT AND LIFE-CYCLE PERFORMANCE OF BRIDGES | 2018年
关键词
OPTIMIZATION;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In this research, a model updating technique based on GA(genetic algorithm) is developed and applied to an existing PS concrete girder bridge. Usually, numerical model updating requires long hours of optimization process and has troubles in accessing to a reliable target solution. To reduce the computational time and improve the accessibility, we developed a program whose whole process runs only in Matlab environment. The parameters used in the proposed model updating process include the design range of the crossover probability, mutation probability, and the step parameter adjusting the amount of increment of the parameter. It was confirmed that the model updating performance is improved when the gene arrangement of the chromosome is closely related to the property of an actual bridge and the static and dynamic characteristics are well applied to the fitness function. The importance of selecting parameter values was determined by complex model formation and the design range of reasonable parameters of the current model.
引用
收藏
页码:1976 / 1981
页数:6
相关论文
共 50 条
  • [1] A GA-based model updating procedure for the numerical simulation of FRCM-to-masonry bond
    Minafo, Giovanni
    Di Leto, Marielisa
    Camarda, Gaetano
    La Mendola, Lidia
    ENGINEERING STRUCTURES, 2024, 303
  • [2] Updating existing railway bridges based on monitoring data
    Bruehwiler, E.
    Rocha, M.
    Treacy, M. A.
    Bittencourt, T. N.
    Neto, A. P. C.
    BRIDGE MAINTENANCE, SAFETY, MANAGEMENT, RESILIENCE AND SUSTAINABILITY, 2012, : 2820 - 2826
  • [3] Establishment and Updating of Nonstationary Random Resistance Deterioration Model for Existing Concrete Bridges
    Yuan Y.-G.
    Chen X.
    Han W.-S.
    Xie Q.
    Wang T.
    Tang L.-L.
    Zhongguo Gonglu Xuebao/China Journal of Highway and Transport, 2019, 32 (12): : 145 - 155
  • [4] System approximation via GA-based fuzzy model
    Teng, YW
    Wang, WJ
    APCCAS 2002: ASIA-PACIFIC CONFERENCE ON CIRCUITS AND SYSTEMS, VOL 2, PROCEEDINGS, 2002, : 547 - 550
  • [5] Fatigue Reliability Updating Evaluation of Existing Steel Bridges
    Wang, Chun Sheng
    Hao, Long
    Fu, Bing Ning
    JOURNAL OF BRIDGE ENGINEERING, 2012, 17 (06) : 955 - 965
  • [6] GA-based multicriteria optimal model for construction scheduling
    Leu, SS
    Yang, CH
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1999, 125 (06): : 420 - 427
  • [7] A GA-based household scheduler
    Meister, K
    Frick, M
    Axhausen, KW
    TRANSPORTATION, 2005, 32 (05) : 473 - 494
  • [8] A hybrid ga-based collaborative filtering model for online recommenders
    Ho, Yvonne
    Fong, Simon
    Yan, Zhuang
    ICE-B 2007: Proceedings of the Second International Conference on e-Business, 2007, : 200 - 203
  • [9] A GA-based household scheduler
    Konrad Meister
    Martin Frick
    Kay W. Axhausen
    Transportation, 2005, 32 : 473 - 494
  • [10] A GA-Based Sales Forecasting Model Incorporating Promotion Factors
    Wang, Li-Chih
    Wang, Chin-Lien
    JOURNAL OF MODERN APPLIED STATISTICAL METHODS, 2010, 9 (02) : 520 - 535