Robust production planning and capacity control for flexible assembly lines

被引:16
|
作者
Gyulai, David [1 ,2 ]
Kadar, Botond [1 ]
Monosotori, Laszlo [1 ,2 ]
机构
[1] Fraunhofer Project Ctr Prod Management & Informat, Comp & Automat Res Inst SZTAKI, Budapest, Hungary
[2] Budapest Univ Technol & Econ, Dept Mfg Sci & Technol, Budapest, Hungary
来源
IFAC PAPERSONLINE | 2015年 / 48卷 / 03期
关键词
assembly; planning; production control; mathematical programming; simulation; SYSTEMS;
D O I
10.1016/j.ifacol.2015.06.432
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The frequently hanging order stream and high product variety require robust planning and control approaches, as well as a flexible system structure in order to fulfill the highest possible customer service level and to keep the production costs on a reasonable level. In the paper, a combined production planning and Capacity control method for assembly lines is proposed aiming at balancing the workload of the human operators and decreasing the overall production costs on a given time horizon. Instead of using the idealistic cycle times and simple manufacturing control rules, the proposed planning and control methodology is based on adaptive calculations taken from continuously Updated historical production data. The manufacturing execution-level data is applied for building regression models predicting the capacity requirements of the future production scenarios. Besides, the historical data is also used as direct, input of discrete-event simulations, to determine the proper control policies of human operator allocations for the different scenarios mentioned above. In order to calculate reliable and feasible production plans, the regression models and control policies are integrated in a mathematical programming model that minimizes a cost function representing the total production costs. (C) 2015, IFAC (International Federation of Automatic Control) Hosting by Elsevier Ltd. All rights reserved.
引用
收藏
页码:2312 / 2317
页数:6
相关论文
共 50 条
  • [1] Robust production planning and control for multi-stage systems with flexible final assembly lines
    Gyulai, David
    Pfeiffer, Andras
    Monostori, Laszlo
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2017, 55 (13) : 3657 - 3673
  • [2] Integrated Capacity Planning and Production Control of an Assembly Manufacturing System
    Chen, Wenliang
    Wang, Zheng
    [J]. IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2021, 68 (03) : 868 - 880
  • [3] Intelligent production control decision support system for flexible assembly lines
    Guo, Z. X.
    Wong, W. K.
    Leung, S. Y. S.
    Fan, J. T.
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2009, 36 (03) : 4268 - 4277
  • [4] A MODEL FOR CAPACITY PLANNING OF FLEXIBLE ROBOTIC ASSEMBLY SYSTEMS
    DAS, TK
    HAN, MH
    BABU, AJG
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1989, 27 (12) : 2075 - 2088
  • [5] Simulation-based reconfiguration planning of flexible assembly lines
    Siedelhofer C.
    Schallow J.
    Wolf P.
    Mayer S.
    Deuse J.
    [J]. ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb, 2018, 113 (04): : 216 - 219
  • [6] Energy flexible production planning and control
    Schuh G.
    Prote J.-P.
    Luckert M.
    Sauermann F.
    Thomas K.
    [J]. ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb, 2017, 112 (12): : 857 - 859
  • [7] A framework for capacity planning and machine configuration in flexible assembly systems
    Heungsoon Felix Lee
    Mandyam M. Srinivasan
    Candace Arai Yano
    [J]. International Journal of Flexible Manufacturing Systems, 2006, 18 : 239 - 268
  • [8] A framework for capacity planning and machine configuration in flexible assembly systems
    Lee, Heungsoon Felix
    Srinivasan, Mandyam M.
    Yano, Candace Arai
    [J]. INTERNATIONAL JOURNAL OF FLEXIBLE MANUFACTURING SYSTEMS, 2006, 18 (04): : 239 - 268
  • [9] AN ALGORITHM FOR THE WEEKLY PRODUCTION PLANNING OF FLEXIBLE ASSEMBLY SYSTEMS
    GARETTI, M
    LANZA, C
    POZZETTI, A
    [J]. INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 1994, 7 (04) : 249 - 259
  • [10] PRODUCTION PLANNING BY MATHEMATICAL-METHODS FOR ASSEMBLY LINES
    RABAR, F
    KRAJCSOVITS, M
    [J]. METRIKA, 1964, 7 (03) : 213 - 230