Writing ?usable? Nuclear Power Plant (NPP) safety cases using bowtie methodology

被引:10
|
作者
Ilizastigui Perez, Fidel [1 ]
机构
[1] Calle B 9310 Entre A & Parque, Altahabana 10804, Habana, Cuba
关键词
Nuclear safety cases; Safety case process; Bowtie;
D O I
10.1016/j.psep.2021.03.022
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Historically, the majority of Nuclear Power Plants (NPP) Safety Cases have been produced and implemented under highly prescriptive regulatory regimes, with emphasis placed on demonstrations of the robustness of the facility's design basis against a set of deterministic criteria and technical standards and rules set by the Regulatory Body. This has resulted in Safety Cases that are technically sound, but at the same time too complex and not easily accessible to and usable by persons responsible for ensuring safe operations; i.e. operations and maintenance staff who are in direct control of the plant as well as managers who are accountable for safety-the key end-users. Shortcomings regarding the 'usability' of the Safety Cases are not new and have been the subject of discussion in recent years. They are deeply rooted in the way these documents are produced and implemented. It means that in order to overcome these difficulties attention should be focused primarily on the Safety Case process, affording it the same importance that is given to the final product-the documented Safety Case. This paper explores the advantages that incorporation of the Bowtie risk management methodology into the Safety Case (production) strategy can bring to the delivery of a fit-for purpose, accessible and usable Safety Case, supporting current efforts undertaken by the nuclear industry to ensure 'Right First Time Safety Cases'. The paper also suggests that the conduct of Bowtie workshops in the author's opinion, the most important part of the Bowtie building process-provides vital input from the people who have most knowledge and experience of the plant and its current operational status. It enables the Bowtie diagrams to reflect the 'operational reality' in the plant, by providing a real picture of the actual barrier condition and, more importantly, to identify those barriers that need to be strengthened. The latter will have a direct effect on the usability of the resultant Safety Case product during plant operation. A generic Advanced Boiling Water Reactor (ABWR) design has been taken as an example to highlight the claimed advantages. The paper reflects how Bowtie diagrams can be built within a workshop setting that depicts how a particular accident scenario can be managed through appropriate barriers and controls. It also shows how the use of Bowtie diagrams can make the Safety Case process a true 'aid' to thinking and deliver a final product that is accessible and easy-to-understand by key end-users. (c) 2021 Institution of Chemical Engineers. Published by Elsevier B.V. All rights reserved.
引用
收藏
页码:850 / 857
页数:8
相关论文
共 50 条
  • [1] REQUIREMENTS FOR RELIABILITY OF NUCLEAR POWER PLANT (NPP) SAFETY SYSTEMS.
    Bukrinskii, A.M.
    Shviryaev, Yu.V.
    Derzhinskii, F.E.
    [J]. Soviet power engineering, 1981, 10 (03): : 323 - 337
  • [2] Methodology and results of a nuclear power plant seismic probabilistic safety assessment
    Richner, Martin
    Tinic, Sener
    Proske, Dirk
    Ravindra, Mayasandra
    Campbell, Robert
    Beigi, Farzin
    Asfura, Alejandro
    [J]. APPLICATIONS OF STATISTICS AND PROBABILITY IN CIVIL ENGINEERING, 2011, : 1528 - 1536
  • [3] A quantification methodology of Seismic Probabilistic Safety Assessment for nuclear power plant
    Ryu, Junghyun
    Jae, Moosung
    [J]. Annals of Nuclear Energy, 2021, 159
  • [4] A quantification methodology of Seismic Probabilistic Safety Assessment for nuclear power plant
    Ryu, Junghyun
    Jae, Moosung
    [J]. ANNALS OF NUCLEAR ENERGY, 2021, 159
  • [5] APPLICATION OF A METHODOLOGY TO DETERMINE PRIORITIES OF NUCLEAR-POWER PLANT SAFETY ISSUES
    DALING, PM
    MILSTEAD, WC
    [J]. NUCLEAR ENGINEERING AND DESIGN, 1989, 115 (2-3) : 273 - 279
  • [6] Equipment Selection Methodology of Seismic Probability Safety Assessment for Nuclear Power Plant
    Ryu, Junghyun
    Jae, Moosung
    [J]. ATW-INTERNATIONAL JOURNAL FOR NUCLEAR POWER, 2021, 66 (06): : 27 - 36
  • [7] Methodology and results of the seismic probabilistic safety assessment of Krsko Nuclear Power Plant
    Vermaut, M
    Monette, P
    Shah, P
    Campbell, RD
    [J]. NUCLEAR ENGINEERING AND DESIGN, 1998, 182 (01) : 59 - 72
  • [8] A METHODOLOGY TO DETERMINE PRIORITIES FOR NUCLEAR-POWER PLANT GENERIC SAFETY ISSUES
    GALLUCCI, RHV
    ANDREWS, WB
    HENAGER, CH
    KONZEK, GJ
    EMRIT, RC
    [J]. NUCLEAR SAFETY, 1984, 25 (05): : 609 - 622
  • [9] A Study on the Determinants of Decommissioing Cost for Nuclear Power Plant (NPP)
    Cha, Hyungi
    Yoon, Yongbeum
    Park, Soojin
    [J]. JOURNAL OF NUCLEAR FUEL CYCLE AND WASTE TECHNOLOGY, 2021, 19 (01): : 87 - 111
  • [10] Reliability Assessment of Auxiliary Power Supply Systems for a Nuclear Power Plant (NPP)
    Ghidu, Mihai-Alexandru
    Nemes, Ciprian
    [J]. PROCEEDINGS OF 9TH INTERNATIONAL CONFERENCE ON MODERN POWER SYSTEMS (MPS 2021), 2021,