共 50 条
- [1] Study on Application of CSG Cofferdam in Hydropower Station Construction [J]. 2009 ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), VOLS 1-7, 2009, : 44 - 47
- [2] The optimization and adjustment of the cofferdam of Jinping I hydropower station [J]. Sichuan Daxue Xuebao (Gongcheng Kexue Ban)/Journal of Sichuan University (Engineering Science Edition), 2010, 42 (02): : 15 - 20
- [3] Analysis for the seepage stability of the upstream cofferdam of one hydropower station [J]. MACHINERY ELECTRONICS AND CONTROL ENGINEERING III, 2014, 441 : 286 - 290
- [4] Study on hydraulics of the overtopped cofferdam used for flood diversion in hydropower engineering [J]. DAMS AND RESERVOIRS, SOCIETIES AND ENVIRONMENT IN THE 21ST CENTURY, VOLS 1 AND 2, 2006, : 1023 - +
- [5] Seepage Calculation and Analysis of the Upstream Earth-Rock Cofferdam of the Pinecone Hydropower Station [J]. PROGRESS IN CIVIL ENGINEERING, PTS 1-4, 2012, 170-173 : 2017 - +
- [6] Deep base anti-slide stability analysis of power house section of Wujiang Shatuo Hydropower Station [J]. Rock Soil Mech, 2007, SUPPL. (586-590):
- [7] Construction Research on The Green Hydropower of Houziyan Hydropower Station [J]. ADVANCED DESIGN AND MANUFACTURING TECHNOLOGY III, PTS 1-4, 2013, 397-400 : 717 - 721
- [8] Dynamic coupled simulation analysis of seepage and stress deformation of upstream cofferdam of Lava Hydropower Station [J]. Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2021, 43 (04): : 613 - 623
- [9] Synthetic geology information system and its application in the shiplock slope engineering of a hydropower station [J]. Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2000, 22 (02): : 182 - 185
- [10] Application Research of Improved Dynamic Programming for Economic Operation of Gezhouba Hydropower Station [J]. 2010 THE 3RD INTERNATIONAL CONFERENCE ON COMPUTATIONAL INTELLIGENCE AND INDUSTRIAL APPLICATION (PACIIA2010), VOL V, 2010, : 327 - 330