A Crane Guidance System with Scheduling Optimization Technology in a Steel Slab Yard

被引:5
|
作者
Kuyama, Shuji [1 ]
Tomiyama, Shinji [1 ]
机构
[1] JFE Steel Corp, Steel Res Lab, Kawasaki Ku, 1-1 Minamiwatarida Cho, Kawasaki, Kanagawa 2100855, Japan
关键词
transportation; optimization methods; logistics simulation;
D O I
10.2355/isijinternational.ISIJINT-2015-466
中图分类号
TF [冶金工业];
学科分类号
0806 ;
摘要
Recently, optimization technologies are commonly applied in logistics scheduling owing to significantly advanced computing technologies. In this paper, a new application for scheduling of crane handling in a slab yard is presented for efficient logistics in steel works. The proposed method consists of two phases: scheduling optimization and logistics simulation. The first phase in this approach utilizes a genetic algorithm that is employed to solve a relaxed scheduling problem of rearranging steel slabs in an approximate manner. Next the partial solution is iterated upon by a rule-based algorithm to obtain a feasible solution. Computational experiments are conducted with operation data of JFE Steel, allowing a comparison to be made between actual and theoretical crane handling operations. The resulted data show that this paper's proposal can reduce the number of handlings by 30%. The effective transportation of slabs contributes to achieving the delivery time and then to the increase of the customer satisfaction.
引用
收藏
页码:820 / 827
页数:8
相关论文
共 50 条
  • [1] Integrated optimization of storage location assignment and crane scheduling in an unmanned slab yard
    Peng, Gongzhuang
    Wu, Youqi
    Zhang, Chunjiang
    Shen, Weiming
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2021, 161
  • [2] A Branch and Price Algorithm for Crane Assignment and Scheduling in Slab Yard
    Wang, Xu
    Zhou, MengChu
    Zhao, Qiuhong
    Liu, Shixin
    Guo, Xiwang
    Qi, Liang
    [J]. IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2021, 18 (03) : 1122 - 1133
  • [3] Modeling and Solution of Crane Scheduling in Slab Yard of Steelmaking Plant
    Yang, Liying
    DanNiu
    Liu, Minghao
    Li, Qi
    Yang, Jun
    [J]. 2022 41ST CHINESE CONTROL CONFERENCE (CCC), 2022, : 5847 - 5852
  • [4] Robust optimization algorithm for integrated crane assignment and scheduling in slab yard with uncertain arrival time
    Wang, Xu
    Zhao, Qiuhong
    Liu, Shixin
    Wang, Jia
    Qi, Liang
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2024,
  • [5] On the Optimization of Yard Crane Scheduling in a Container Terminal Based on GATS
    Hu Yanhong
    Sun Junqing
    Han Mei
    Liu Fenglian
    Yang Peng
    Feng Meiling
    [J]. PROCEEDINGS OF THE 29TH CHINESE CONTROL CONFERENCE, 2010, : 5473 - 5477
  • [6] Integrated Scheduling Optimization of Yard Crane and Yard Truck in Ship-loading Operation
    Cao, Pengliang
    Jiang, Guiyan
    Zhao, Hongran
    [J]. PROCEEDINGS OF THE 2017 2ND INTERNATIONAL CONFERENCE ON CIVIL, TRANSPORTATION AND ENVIRONMENTAL ENGINEERING (ICCTE 2017), 2017, 135 : 568 - 573
  • [7] Integrated Scheduling Optimization of Yard Crane and Yard Truck in Ship-loading Operation
    Cao, Pengliang
    Zhao, Hongran
    Jiang, Guiyan
    [J]. 2017 4TH INTERNATIONAL CONFERENCE ON TRANSPORTATION INFORMATION AND SAFETY (ICTIS), 2017, : 595 - 599
  • [8] Unmanned Cranes Scheduling and System Implementation of a CPS-based Steel Slab Yard
    Liang, Yueyong
    Peng, Gongzhuang
    Wu, Youqi
    Yang, Geng
    [J]. PROCEEDINGS OF THE 2021 IEEE 24TH INTERNATIONAL CONFERENCE ON COMPUTER SUPPORTED COOPERATIVE WORK IN DESIGN (CSCWD), 2021, : 997 - 1002
  • [9] Integrated optimization on yard crane scheduling and vehicle positioning at container yards
    Zhou, Chenhao
    Lee, Byung Kwon
    Li, Haobin
    [J]. TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2020, 138
  • [10] An exact method for scheduling a yard crane
    Gharehgozli, Amir Hossein
    Yu, Yugang
    de Koster, Rene
    Udding, Jan Tijmen
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2014, 235 (02) : 431 - 447