Short-term Time Series Forecasting of Concrete Sewer Pipe Surface Temperature

被引:0
|
作者
Thiyagarajan, Karthick [1 ]
Kodagoda, Sarath [1 ]
Ulapane, Nalika [2 ]
机构
[1] Univ Technol Sydney, Fac Engn & Informat Technol, UTS Robot Inst, iPipes Lab, Sydney, NSW 2007, Australia
[2] Univ Melbourne, Melbourne Sch Engn, Sch Elect & Elect Engn, Parkville, Vic 3052, Australia
关键词
ARIMA model; concrete corrosion; ETS model; forecasting model; sewer pipe; short-term forecasting; surface temperature sensor; temporal; time series; SUITE;
D O I
10.1109/icarcv50220.2020.9305439
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Microbial corrosion is considered the main reason for multi-billion dollar sewer asset degradation. Sewer pipe surface temperature is a vital parameter for predicting the micro-biologically induced concrete corrosion. Due to this important measure, a surface temperature sensor suite was recently developed and tested in an aggressive sewer environment. The sensors can fail and they may also put offline during the period of scheduled maintenance. In such situations, time series forecasting of sensor data can be an alternative measure for the operators managing the sewer network. In this regard, this paper focuses on the short-term forecasting of sensor measurements. The evaluation was carried out by forecasting the sensor measurements for different time periods and evaluated with different forecasting models. The ETS model leads to high short-term forecasting accuracy and the ARIMA model leads to high long-term forecasting accuracy. The models were evaluated on real data captured in a Sydney sewer.
引用
收藏
页码:1194 / 1199
页数:6
相关论文
共 50 条
  • [1] A New Approach for Short-term Time Series Forecasting
    Fan, Henghai
    Wu, Shuai
    Chen, Ning
    Gao, Bo
    Xu, Yiming
    2019 3RD INTERNATIONAL CONFERENCE ON ARTIFICIAL INTELLIGENCE APPLICATIONS AND TECHNOLOGIES (AIAAT 2019), 2019, 646
  • [2] METHOD OF SHORT-TERM FORECASTING OF SURFACE TEMPERATURE.
    Serebryannik, N.I.
    Uspenskii, B.D.
    Soviet meteorology and hydrology, 1984, (08): : 88 - 91
  • [3] FORECASTING SHORT-TERM REVENUES FOR WATER AND SEWER UTILITIES
    BOLAND, JJ
    WENTWORTH, RW
    STEINER, RC
    JOURNAL AMERICAN WATER WORKS ASSOCIATION, 1982, 74 (09): : 460 - 465
  • [4] Short-term load forecasting using time series clustering
    Ana Martins
    João Lagarto
    Hiren Canacsinh
    Francisco Reis
    Margarida G. M. S. Cardoso
    Optimization and Engineering, 2022, 23 : 2293 - 2314
  • [5] Short-term load forecasting using time series clustering
    Instituto Superior de Engenharia de Lisboa, Instituto Politécnico de Lisboa, Lisbon, Portugal
    不详
    不详
    Optim. Eng., 2022, 4 (2293-2314):
  • [6] THE TIME-SERIES APPROACH TO SHORT-TERM LOAD FORECASTING
    HAGAN, MT
    BEHR, SM
    IEEE TRANSACTIONS ON POWER SYSTEMS, 1987, 2 (03) : 785 - 791
  • [7] Short-term Electricity Load Forecasting with Time Series Analysis
    Hung Nguyen
    Hansen, Christian K.
    2017 IEEE INTERNATIONAL CONFERENCE ON PROGNOSTICS AND HEALTH MANAGEMENT (ICPHM), 2017, : 214 - 221
  • [8] Short-term time series algebraic forecasting with internal smoothing
    Ragulskis, M. (minvydas.ragulskis@ktu.lt), 1600, Elsevier B.V., Netherlands (127):
  • [9] Short-term load forecasting using a chaotic time series
    Michanos, SP
    Tsakoumis, AC
    Fessas, P
    Vladov, SS
    Mladenov, VM
    SCS 2003: INTERNATIONAL SYMPOSIUM ON SIGNALS, CIRCUITS AND SYSTEMS, VOLS 1 AND 2, PROCEEDINGS, 2003, : 437 - 440
  • [10] Short-term time series algebraic forecasting with mixed smoothing
    Palivonaite, Rita
    Lukoseviciute, Kristina
    Ragulskis, Minvydas
    NEUROCOMPUTING, 2016, 171 : 854 - 865