共 50 条
- [5] The impact factor may be flawed but important [J]. BJU INTERNATIONAL, 2016, 118 (02) : 179 - 179
- [7] Tests of cellular sheet-steel flooring [J]. BUREAU OF STANDARDS JOURNAL OF RESEARCH, 1932, 9 (02): : 131 - 161
- [8] FLAWED CPM SCHEDULE MAY BE COSTLY TO CONTRACTOR [J]. CIVIL ENGINEERING, 1993, 63 (11): : 38 - 38
- [9] SLIP RESISTANCE TESTS FOR FLOORING - 2 METHODS COMPARED [J]. POLYMER TESTING, 1985, 5 (06) : 403 - 425