Customer-satisfaction-aware and deadline-constrained profit maximization problem in cloud computing

被引:0
|
作者
Chen, Siyi [1 ]
Liu, Jin [2 ]
Ma, Fengchao [3 ]
Huang, Huixian [4 ,5 ]
机构
[1] Xiangtan Univ, Sch Automat & Ind Elect, Xiangtan 411105, Hunan, Peoples R China
[2] Xiangtan Univ, Sch Automat & Elect Informat, Dept Elect & Commun Engn, Xiangtan, Hunan, Peoples R China
[3] Xiangtan Univ, Sch Automat & Elect Informat, Dept Control Engn, Xiangtan, Hunan, Peoples R China
[4] Xiangtan Univ, Discipline Control Sci & Engn, Xiangtan, Hunan, Peoples R China
[5] Hunan Univ Informat Technol, Xiangtan, Hunan, Peoples R China
关键词
Cloud computing; Profit maximization; Cyclic cascade queuing system; Heterogeneous; Waiting time; Satisfaction; RESOURCE-ALLOCATION; OPTIMIZATION; SERVICE; DISTRIBUTIONS; SYSTEM; POWER; TIME;
D O I
10.1016/j.jpdc.2022.02.003
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
As a new and modern service method that can meet the requirements of customers effectively, cloud computing is becoming more and more popular. For cloud service providers, they play an important role in constructing the cloud computing platform, which is convenient for customers to enjoy the services without paying attention to the execution process of the services. For cloud service providers and customers, they focus on profit and satisfaction respectively in service supply-demand relationship, and the pursuit of their objectives both have an influence on each other. On one hand, the configuration of the cloud computing platform is the main solution for cloud service providers to earn profit, which affects customer satisfaction based on specific constraints. On the other hand, customer satisfaction affects the arrival rate of service requests, which will affect the profit in turn. In this paper, we devote ourselves to analyzing a deadline constrained profit maximization problem in a cyclic cascade queuing system, in which the maximum tolerance of customers towards task waiting time is taken into consideration. On this basis, the definition of customer satisfaction is given. And then, a mathematical model is formulated in detail on how customer satisfaction affects the revenues of cloud service providers, and further affects their profits. However, the exact solutions of such model can hardly be calculated due to its complexity. Hence, we propose a heuristic algorithm to find the high-quality solution, then the optimal configuration of cloud computing platform can be obtained to achieve the maximization of the profit for cloud service providers on the basis of promoting customer satisfaction. At last, a series of numerical simulations are conducted to validate the performance of the proposed algorithm. The results show that the proposed algorithm can not only optimize profit and customer satisfaction simultaneously but also maintain them at a high level in the long run of the system. (C)& nbsp;2022 Elsevier Inc. All rights reserved.
引用
收藏
页码:198 / 213
页数:16
相关论文
共 50 条
  • [1] Customer-satisfaction-aware and deadline-constrained profit maximization problem in cloud computing
    Chen, Siyi
    Liu, Jin
    Ma, Fengchao
    Huang, Huixian
    [J]. Journal of Parallel and Distributed Computing, 2022, 163 : 198 - 213
  • [2] Customer-Satisfaction-Aware Optimal Multiserver Configuration for Profit Maximization in Cloud Computing
    Mei, Jing
    Li, Kenli
    Li, Keqin
    [J]. IEEE TRANSACTIONS ON SUSTAINABLE COMPUTING, 2017, 2 (01): : 17 - 29
  • [3] Energy aware scheduling of deadline-constrained tasks in cloud computing
    Kaur, Tarandeep
    Chana, Inderveer
    [J]. CLUSTER COMPUTING-THE JOURNAL OF NETWORKS SOFTWARE TOOLS AND APPLICATIONS, 2016, 19 (02): : 679 - 698
  • [4] Energy aware scheduling of deadline-constrained tasks in cloud computing
    Tarandeep Kaur
    Inderveer Chana
    [J]. Cluster Computing, 2016, 19 : 679 - 698
  • [5] An Efficient Energy-Aware Tasks Scheduling with Deadline-Constrained in Cloud Computing
    Ben Alla, Said
    Ben Alla, Hicham
    Touhafi, Abdellah
    Ezzati, Abdellah
    [J]. COMPUTERS, 2019, 8 (02)
  • [6] Deadline-Constrained Cost Minimisation for Cloud Computing Environments
    Manam, Samuel
    Moessner, Klaus
    Vural, Serdar
    [J]. IEEE ACCESS, 2023, 11 : 38514 - 38522
  • [7] Energy-aware intelligent scheduling for deadline-constrained workflows in sustainable cloud computing
    Cao, Min
    Li, Yaoyu
    Wen, Xupeng
    Zhao, Yue
    Zhu, Jianghan
    [J]. EGYPTIAN INFORMATICS JOURNAL, 2023, 24 (02) : 277 - 290
  • [8] A Profit Maximization Scheme in Cloud Computing With Deadline Constraints
    Chen, Siyi
    Huang, Sining
    Luo, Qiang
    Zhou, Jialing
    [J]. IEEE ACCESS, 2020, 8 : 118924 - 118939
  • [9] Coalition formation for deadline-constrained resource procurement in cloud computing
    Hu, Junyan
    Li, Kenli
    Liu, Chubo
    Chen, Jianguo
    Li, Keqin
    [J]. Journal of Parallel and Distributed Computing, 2021, 149 : 1 - 12
  • [10] Coalition formation for deadline-constrained resource procurement in cloud computing
    Hu, Junyan
    Li, Kenli
    Liu, Chubo
    Chen, Jianguo
    Li, Keqin
    [J]. JOURNAL OF PARALLEL AND DISTRIBUTED COMPUTING, 2021, 149 : 1 - 12