Fuzzy chance constrained programming model for refinery short-term scheduling problem

被引:0
|
作者
Cuiwen, C. [1 ]
Bin, J. [1 ,2 ]
Xingsheng, G. [1 ]
机构
[1] E China Univ Sci & Technol, Res Inst Automat, Shanghai, Peoples R China
[2] Shanghai Dianji Univ, Dept Elect Engn, Shanghai, Peoples R China
基金
中国国家自然科学基金;
关键词
crude oil short-term scheduling; fuzzy chance constrained; mixed-integer nonlinear programming;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper develops a fuzzy chance constrained mixed-integer nonlinear programming (FCC-MINLP) model and the solution methods for refinery short-term crude oil scheduling problem under demands uncertainty. To reduce the calculation complexity of the model, it is transformed into its equivalent fuzzy chance constrained mixed-integer linear programming (FCC-MILP) model by using the method of Quesada & Grossmann [5]. After that the FCC-MILP model is solved through its crisp equivalent algorithm and fuzzy simulation algorithm rely on the theory presented by Liu & 1wamura [12][13] for the first time in this area. Finally, a case study which has 265 continuous variables, 68 binary variables and 318 constraints is effectively solved in LINGO 8.0 [8] with the proposed approaches.
引用
收藏
页码:352 / +
页数:2
相关论文
共 50 条
  • [1] Chance constrained programming models for refinery short-term crude oil scheduling problem
    Cao, Cuiwen
    Gu, Xingsheng
    Xin, Zhong
    [J]. APPLIED MATHEMATICAL MODELLING, 2009, 33 (03) : 1696 - 1707
  • [2] Chance constrained programming with fuzzy parameters for refinery crude oil scheduling problem
    Cao, Cuiwen
    Gu, Xingsheng
    [J]. FUZZY SYSTEMS AND KNOWLEDGE DISCOVERY, PROCEEDINGS, 2006, 4223 : 1010 - 1019
  • [3] Stochastic chance constrained mixed-integer nonlinear programming models and the solution approaches for refinery short-term crude oil scheduling problem
    Cao, Cuiwen
    Gu, Xingsheng
    Xin, Zhong
    [J]. APPLIED MATHEMATICAL MODELLING, 2010, 34 (11) : 3231 - 3243
  • [4] A chance constrained programming model for short-term liner ship fleet planning problems
    Meng, Qiang
    Wang, Tingsong
    [J]. MARITIME POLICY & MANAGEMENT, 2010, 37 (04) : 329 - 346
  • [5] Nonlinear fuzzy chance constrained programming problem
    Panda G.
    Dash J.K.
    [J]. OPSEARCH, 2014, 51 (2) : 270 - 279
  • [6] Uncertain chance-constrained programming model for project scheduling problem
    Wang, Xiao
    Ning, Yufu
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2018, 69 (03) : 384 - 391
  • [7] FUZZY CHANCE CONSTRAINED PROGRAMMING MODEL FOR DEMAND-RESPONSIVE AIRPORT SHUTTLE BUS SCHEDULING PROBLEM
    Wei, Ming
    Sun, Bo
    Jing, Binbin
    Wu, Wei
    [J]. JOURNAL OF NONLINEAR AND CONVEX ANALYSIS, 2020, 21 (07) : 1605 - 1620
  • [8] A CHANCE CONSTRAINED PROGRAMMING MODEL FOR SHORTEST PATH PROBLEM WITH FUZZY CONSTRAINTS
    Dursun, Pinar
    Bozdag, Erhan
    [J]. UNCERTAINTY MODELING IN KNOWLEDGE ENGINEERING AND DECISION MAKING, 2012, 7 : 489 - 494
  • [9] New strategy for short-term scheduling optimization of cascade hydro plants based on chance-constrained programming
    School of Electrical Engineering, Guangxi University, Nanning 530004, China
    [J]. Zhongguo Dianji Gongcheng Xuebao, 2008, 13 (41-46):
  • [10] Issues on short-term scheduling of oil refinery
    Naiqi Wu
    Yanming Qian
    MengChu Zhou
    Feng Chu
    [J]. 2006 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS, VOLS 1-6, PROCEEDINGS, 2006, : 2920 - +