A comparison of setup strategies for printed circuit board assembly

被引:28
|
作者
Leon, VJ [1 ]
Peters, BA
机构
[1] Texas A&M Univ, Engn Technol Dept, College Stn, TX 77843 USA
[2] Texas A&M Univ, Dept Ind Engn, College Stn, TX 77843 USA
关键词
D O I
10.1016/S0360-8352(97)00162-9
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper develops and tests a set of strategies for operating a single printed-circuit-board assembly machine. In particular, the paper addresses decisions associated with feeder changeover, placement sequencing, and board sequencing. Solution procedures are developed and implemented for a variety of setup management strategies, including group and partial setup. These procedures are tested on a range of problems to determine their relative performance under different production environments. The procedure for group setup is shown to be applicable when component commonality is high and changeovers are time consuming. Partial setup strategies, which focus on minimizing the total production time, are shown to adapt to changing production conditions and therefore outperform the other setup strategies. (C) 1998 Elsevier Science Ltd. All rights reserved.
引用
收藏
页码:219 / 234
页数:16
相关论文
共 50 条
  • [1] Replanning and analysis of partial setup strategies in printed circuit board assembly systems
    Leon, VJ
    Peters, BA
    [J]. INTERNATIONAL JOURNAL OF FLEXIBLE MANUFACTURING SYSTEMS, 1996, 8 (04): : 389 - 411
  • [2] Machine setup and component placement in printed circuit board assembly
    Bard, Jonathan F.
    Clayton, Raymond W.
    Feo, Thomas A.
    [J]. International Journal of Flexible Manufacturing Systems, 1994, 6 (01): : 5 - 31
  • [3] Setup reduction in printed circuit board assembly by efficient sequencing
    Narayanaswami, R
    Iyengar, V
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2005, 26 (03): : 276 - 284
  • [4] Setup reduction in printed circuit board assembly by efficient sequencing
    R. Narayanaswami
    V. Iyengar
    [J]. The International Journal of Advanced Manufacturing Technology, 2005, 26 : 276 - 284
  • [5] Reducing setup time for printed circuit assembly
    Palm, RC
    [J]. HEWLETT-PACKARD JOURNAL, 1996, 47 (04): : 84 - 90
  • [6] Workload balancing in printed circuit board assembly
    Emet, Stefan
    Knuutila, Timo
    Alhoniemi, Esa
    Maier, Michael
    Johnsson, Mika
    Nevalainen, Olli S.
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 50 (9-12): : 1175 - 1182
  • [7] SPC IN PRINTED-CIRCUIT BOARD ASSEMBLY
    DOBBINS, JG
    PADGETT, WJ
    [J]. QUALITY PROGRESS, 1993, 26 (07) : 65 - 67
  • [8] An allocation problem in Printed Circuit Board assembly
    Ashayeri, J
    Van Dorp, AM
    [J]. FLEXIBLE AUTOMATION AND INTELLIGENT MANUFACTURING, 1998, 1998, : 299 - 309
  • [9] Embedded Resistors in Printed Circuit Board Assembly
    Wang, Shouguo
    [J]. 2013 8TH INTERNATIONAL SYMPOSIUM ON ADVANCED TOPICS IN ELECTRICAL ENGINEERING (ATEE), 2013,
  • [10] Printed circuit board assembly equipment & materials
    [J]. Assembly, 1998, 41 (07):