摘要
The Tritium Laboratory Karlsruhe (TLK) is developing major components and processes for the ITER tritium plant. The systems being examined are for pumping, storage, analytics and waste treatment. A full sized, fast delivery getter storage bed with an in-built accountancy system is being tested. In-situ methods to detritiate and deactivate getter beds for safe disposal are being pursued and are reported here. A water detritiation system based on a Combined Electrolysis Catalytic Exchange process is under development which uses a solid state electrolyser and a catalyst column with water vapour and hydrogen streams in counter current mode. A Permeator/Catalyst (PERMCAT) device is being tested both at TLK and JET for the reduction of tritium in waste gases to below I Ci/m(3). To pump gases at high speeds a tritium-compatible Root pumps is being tested which uses ferro-fluidic seals on the drive shafts. The ferro-fluidic seals have been tested satisfactorily and these have been incorporated into a Roots pump of 250 m(3)/hr pumping capacity. Micro gas chromatography is being developed for the analysis of gas mixtures for process control and accountancy. A 20 litre vacuum calorimeter with a limit of detection of approximately 6 GBq tritium has been constructed and commissioned.
引用
收藏
页码:12 / 15
页数:4
相关论文
共 50 条
  • [1] The development of standard operating procedures for the SDS of the ITER tritium plant
    Song, Kyu-Min
    Sohn, Soon Hwan
    Chung, Yang Geun
    Cho, Seungyon
    Kim, Duck-Hoi
    Ahn, Mu-Young
    Chung, Hongsuk
    Shim, Myunghwa
    Kim, Dukjin
    Yoshida, Hiroshi
    [J]. FUSION ENGINEERING AND DESIGN, 2008, 83 (10-12) : 1380 - 1383
  • [2] US tritium plant activities for ITER
    Willms, RS
    [J]. FUSION SCIENCE AND TECHNOLOGY, 2005, 47 (04) : 979 - 982
  • [3] Status of the ITER Tritium Plant design
    Yoshida, H
    Kveton, O
    Koonce, J
    Holland, D
    Haange, R
    [J]. FUSION ENGINEERING AND DESIGN, 1998, 39-40 : 875 - 882
  • [4] STATUS OF ITER TRITIUM PLANT-DESIGN
    HAANGE, R
    YOSHIDA, H
    KVETON, O
    KOONCE, J
    HORIKIRI, H
    [J]. FUSION TECHNOLOGY, 1995, 28 (03): : 491 - 495
  • [5] The water detritiation system of the ITER tritium plant
    Iwai, Y
    Misaki, Y
    Hayashi, T
    Yamanishi, T
    Konishi, S
    Nishi, M
    Ninomiya, R
    Yanagimachi, S
    Senrui, S
    Yoshida, H
    [J]. FUSION SCIENCE AND TECHNOLOGY, 2002, 41 (03) : 1126 - 1130
  • [6] Development of ITER tritium transport package
    Lee, Sanghoon
    Lee, Min-Soo
    Lee, Ju-Chan
    Choi, Woo-Seok
    Kim, Ki-Young
    Jeon, Je-Eon
    Seo, Ki-Seog
    Shu, Wataru
    Manfred, Glugla
    [J]. FUSION ENGINEERING AND DESIGN, 2013, 88 (03) : 136 - 144
  • [7] Combined scheduling model to optimize tritium inventory in tritium plant of ITER
    Lee, Suh-Young
    Lee, Jae-Uk
    Chang, Min Ho
    Ha, Jin-Kuk
    Lee, In-Beum
    Lee, Min-Kyung
    Lee, Euy Soo
    [J]. FUSION ENGINEERING AND DESIGN, 2021, 169
  • [8] The analytical system of the ITER Tritium Fuel Processing Plant
    Lässer, R
    Glugla, M
    Schuster, P
    Hayashi, T
    Yoshida, H
    [J]. FUSION SCIENCE AND TECHNOLOGY, 2002, 41 (03) : 520 - 524
  • [9] Tritium supply assessment for ITER and DEMOnstration power plant
    Ni, Muyi
    Wang, Yongliang
    Yuan, Baoxin
    Jiang, Jieqiong
    Wu, Yican
    [J]. FUSION ENGINEERING AND DESIGN, 2013, 88 (9-10) : 2422 - 2426
  • [10] Experimental evaluation for fuel delivery in the ITER Tritium Plant
    Chang, Min Ho
    Yun, Sei-Hun
    Chung, Dong-you
    Kang, Hyun-Goo
    Oh, Yun Hee
    Song, Kyu-Min
    Chung, Hongsuk
    [J]. FUSION ENGINEERING AND DESIGN, 2015, 98-99 : 1733 - 1736