Parallel shuttle bus service design for planned mass rapid transit shutdown: The Singapore experience

被引:18
|
作者
Dou, Xueping [1 ]
Wang, Hua [1 ,2 ]
Meng, Qiang [1 ]
机构
[1] Natl Univ Singapore, Dept Civil & Environm Engn, Singapore 117576, Singapore
[2] Tongji Univ, Sch Econ & Management, Shanghai 200092, Peoples R China
关键词
Parallel shuttle bus service; Bus route design; Bus terminal selection; Bus deployment; Bus berth assignment; NETWORK DESIGN; ROUTE; MANAGEMENT; ALGORITHM; RECOVERY;
D O I
10.1016/j.trc.2019.09.022
中图分类号
U [交通运输];
学科分类号
08 ; 0823 ;
摘要
19 MRT stations in Singapore experienced a two full-day shutdown as planned in order to upgrade the infrastructure of aging mass rapid transit (MRT) lines. A large bus fleet, running entirely parallel to MRT lines, was deployed to ferry passengers between affected stations, which however results in prolonged congestion and queue of buses near terminals. Rail transit systems in many metropolitan areas are threatened because of aging infrastructure. This study, motivated by the Singapore case, proposes a novel parallel shuttle bus service design (PSBSD) problem that addresses route design, terminal selection, berth allocation, and bus deployment to minimize inconvenience caused to passengers, which is seldom addressed in previous studies. We further develop a mixed-integer nonlinear programming (MINLP) model for the PSBSD problem. In order to solve the non-convex MINLP model optimally, we put forward an effective decomposition method, which comprises (i) the generation of candidate shuttle bus routes through a brute-force search for semi-route and a terminal selection procedure and (ii) the deployment of buses and assignment of terminal berths for selected shuttle bus routes by using an optimization-based approach. Numerical experiments were conducted using data sets from the MRT closure incident in Singapore. The results demonstrate that the decomposition method is capable of finding optimal solutions. Useful insights are also obtained from testing the models under different scenarios.
引用
收藏
页码:340 / 356
页数:17
相关论文
共 50 条
  • [1] SINGAPORE MASS RAPID TRANSIT SYSTEM - DESIGN
    COPSEY, JP
    HULME, TW
    KRAFT, B
    SRIPATHY, P
    [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1989, 86 : 667 - 707
  • [2] The Design and Implementation of an Automated Bus In Revenue Service on a Bus Rapid Transit Line
    Tan, Han-Shue
    Huang, Jihua
    [J]. 2014 AMERICAN CONTROL CONFERENCE (ACC), 2014, : 5288 - 5293
  • [3] Modelling Behaviour of Shuttle Service Users and Preference towards a Proposed Bus Rapid Transit Line
    Ahmed, Afzal
    Zaidi, Syeda Ofaq Raza
    Ali, Mir Shabbar
    Gul, Palwasha
    [J]. EUROPEAN TRANSPORT-TRASPORTI EUROPEI, 2020, (79): : 1 - 17
  • [4] GUIDED BUS RAPID-TRANSIT - DESIGN AND OPERATING EXPERIENCE, ADELAIDE
    WAYTE, FA
    WILSON, TJ
    [J]. 1989 NATIONAL TRANSPORT CONFERENCE: TRANSPORT FOR THE USERS, 1989, : 265 - 270
  • [5] Singapore mass rapid transit system. Design for noise control
    Lim, M.K.
    [J]. Proceedings - International Conference on Noise Control Engineering, 1988,
  • [6] Optimal routing design for shuttle bus service
    Jerby, Shai
    Ceder, Avishai
    [J]. TRANSIT: BUS, PARATRANSIT, AND MARKETING AND FARE POLICY, 2006, (1971): : 14 - 22
  • [7] Improving bus service reliability: The Singapore experience
    Leong, Waiyan
    Goh, Karen
    Hess, Stephane
    Murphy, Paul
    [J]. RESEARCH IN TRANSPORTATION ECONOMICS, 2016, 59 : 40 - 49
  • [8] SINGAPORE MASS RAPID TRANSIT SYSTEM - CONSTRUCTION
    HULME, TW
    POTTER, LAC
    SHIRLAW, JN
    [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1989, 86 : 709 - 770
  • [9] Measuring Bus Service Reliability: An Example of Bus Rapid Transit in Changzhou
    Huo, Yueying
    Zhao, Jinhua
    Li, Wenquan
    Hu, Xiaojian
    [J]. JOURNAL OF PUBLIC TRANSPORTATION, 2014, 17 (02) : 113 - 133
  • [10] SINGAPORE MASS RAPID-TRANSIT SYSTEM - DISCUSSION
    HULME, TW
    CHAPMAN, PHJ
    FOO, PS
    COPSEY, JP
    KRAFT, B
    SRIPATHY, P
    POTTER, LAC
    SHIRLAW, JN
    [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1991, 90 : 463 - 502