Modelling the behaviour of an earth and rockfill dam during construction and impoundment

被引:0
|
作者
Alonso, EE [1 ]
Olivella, S [1 ]
Hugas, J [1 ]
机构
[1] Univ Politecn Cataluna, Dept Ingn Terreno Cartograf & Geofis, Barcelona, Spain
关键词
D O I
暂无
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
This paper presents a modelling work of the "El Infiernillo" dam which was built in Mexico in the 60's. A recently developed constitutive model for rockfill has been implemented in a coupled finite element program, which solves the hydromechanical problem for general unsaturated conditions. The performance of the dam during construction and impoundment has been analysed. The agreement between calculated and measured displacements indicates that the capabilities of the constitutive models and computational tools used.
引用
收藏
页码:269 / 287
页数:19
相关论文
共 50 条
  • [1] Behaviour of a rockfill dam during construction
    Ohta, H
    Yoshikoshi, H
    Mori, Y
    Yonetani, S
    Itoh, M
    Ishiguro, T
    PROCEEDINGS OF THE FIFTEENTH INTERNATIONAL CONFERENCE ON SOIL MECHANICS AND GEOTECHNICAL ENGINEERING VOLS 1-3, 2001, : 1227 - 1231
  • [2] Modelling the response of Lechago earth and rockfill dam
    Alonso, E. E.
    Olivella, S.
    Sorianoy, A.
    Pinyol, N. M.
    Esteban, F.
    GEOTECHNIQUE, 2011, 61 (05): : 387 - 407
  • [3] Strain Analysis of the Nuozhadu High Rockfill Dam during Initial Impoundment
    Lv, Xiaolong
    Chi, Shichun
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2018, 2018
  • [4] Predicting the Behavior of an Earth and Rockfill Dam under Construction
    Costa, L. M.
    Alonso, E. E.
    JOURNAL OF GEOTECHNICAL AND GEOENVIRONMENTAL ENGINEERING, 2009, 135 (07) : 851 - 862
  • [5] Effect of number of layers on incremental construction analysis of earth and rockfill dam
    Zomorodian, S. M. A.
    Sahebzadeh, K.
    Haghighi, A. Torabi
    DAMS AND RESERVOIRS, SOCIETIES AND ENVIRONMENT IN THE 21ST CENTURY, VOLS 1 AND 2, 2006, : 825 - +
  • [6] The Inversion Analysis and Material Parameter Optimization of a High Earth-Rockfill Dam during Construction Periods
    Pan, Shiyang
    Li, Tongchun
    Shi, Guicai
    Cui, Zhen
    Zhang, Hanjing
    Yuan, Li
    APPLIED SCIENCES-BASEL, 2022, 12 (10):
  • [7] DESIGN, CONSTRUCTION CONTROL AND PERFORMANCE OF THE SVARTEVANN EARTH-ROCKFILL DAM.
    Kjoernsli, Bjorn
    Kvale, Gunnar
    Lunde, Johnny
    Baade-Mathiesen, Johan
    Publikasjon - Norges Geotekniske Institutt, 1982, (142):
  • [8] Analysis of behaviour of a high rockfill dam
    Soroush, A
    Araei, AA
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-GEOTECHNICAL ENGINEERING, 2006, 159 (01) : 49 - 59
  • [9] Merowe Dam Project - a combination of an earth core rockfill dam and the world longest concrete faced rockfill dam
    Schewe, L. D.
    El Tayeb, A.
    Dams and Reservoirs, Societies and Environment in the 21st Century, Vols 1 and 2, 2006, : 441 - 447
  • [10] A statistical model of deformation during the construction of a concrete face rockfill dam
    Shi, Yuqun
    Yang, Juanjuan
    Wu, Jielian
    He, Jinping
    STRUCTURAL CONTROL & HEALTH MONITORING, 2018, 25 (02):