Automatic generation of production scheduling models in single stage multi-product batch plants: Some examples

被引:5
|
作者
Berber, Ridvan [1 ]
Yuceer, Mehmet [1 ]
Ozdemir, Zafer [1 ]
机构
[1] Ankara Univ, Fac Engn, Dept Chem Engn, TR-06100 Ankara, Turkey
关键词
MILP; production scheduling;
D O I
10.1016/j.mcm.2006.12.031
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This work considers optimal scheduling of a set of orders in a multi-product batch plant with non-identical parallel processing units where the process is single stage. The allocation of orders to the production units was formulated as an MILP problem in continuous time. Starting from the basic model proposed earlier, and adding a new constraint that was missing in previous literature, the new formulation solves the problem with a different objective function which considers the total production time or total production cost of the set of orders, without resorting to the application of any heuristic rules. A special MATLAB program has been developed for automatic creation of the optimization model, which otherwise may be a very time consuming task prone to errors. The formulation has been tested with extensive numerical, as well as one industrial, problems. The results indicate importance of the proposed modifications and effectiveness of the automated generation of the model, and present better solutions for the industrial example considered. (c) 2007 Elsevier Ltd. All rights reserved.
引用
收藏
页码:69 / 79
页数:11
相关论文
共 50 条
  • [1] Production scheduling of single-stage multi-product batch chemical processes with fixed batch sizes
    Dessouky, Maged M.
    Kijowski, Brian A.
    [J]. IIE Transactions (Institute of Industrial Engineers), 1997, 29 (05): : 399 - 408
  • [2] Production scheduling of single-stage multi-product batch chemical processes with fixed batch sizes
    Dessouky, MM
    Kijowski, BA
    [J]. IIE TRANSACTIONS, 1997, 29 (05) : 399 - 408
  • [3] Scheduling of multi-product batch plants based upon timed automata models
    Panek, Sebastian
    Engell, Sebastian
    Subbiah, Subanatarajan
    Stursberg, Olaf
    [J]. COMPUTERS & CHEMICAL ENGINEERING, 2008, 32 (1-2) : 275 - 291
  • [4] Scheduling of multi-product batch plants using reachability analysis of timed automata models
    Subbiah, Subanatarajan
    Panek, Sebastian
    Engell, Sebastian
    Stursberg, Olaf
    [J]. ICINCO 2007: PROCEEDINGS OF THE FOURTH INTERNATIONAL CONFERENCE ON INFORMATICS IN CONTROL, AUTOMATION AND ROBOTICS, VOL ICSO: INTELLIGENT CONTROL SYSTEMS AND OPTIMIZATION, 2007, : 141 - +
  • [5] STATUS OF SOME MULTI-PRODUCT MULTI-PERIOD PRODUCTION SCHEDULING MODELS
    KORTANEK, KO
    SOYSTER, AL
    [J]. MANAGEMENT SCIENCE SERIES B-APPLICATION, 1971, 17 (08): : B560 - B561
  • [6] Rule-based scheduling of multi-stage multi-product batch plants with parallel units
    Shi, Bin
    Qian, Xinrui
    Sun, Shanshan
    Yan, Liexiang
    [J]. CHINESE JOURNAL OF CHEMICAL ENGINEERING, 2017, 25 (08) : 1022 - 1036
  • [7] Rule-based scheduling of multi-stage multi-product batch plants with parallel units
    Bin Shi
    Xinrui Qian
    Shanshan Sun
    Liexiang Yan
    [J]. Chinese Journal of Chemical Engineering, 2017, 25 (08) : 1022 - 1036
  • [8] Batch sizing in multi-stage, multi-product batch production systems
    Trautmann, Norbert
    Baumann, Philipp
    Saner, Nadine
    Schaefer, Tobias
    [J]. 21ST EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING, 2011, 29 : 905 - 909
  • [9] A rule-based genetic algorithm for the scheduling of single-stage multi-product batch plants with parallel units
    He, Yaohua
    Hui, Chi-Wai
    [J]. COMPUTERS & CHEMICAL ENGINEERING, 2008, 32 (12) : 3067 - 3083
  • [10] Production Inventory Models for a Multi-product Batch Production System
    Krishnamurthy, Ananth
    Seethapathy, Divya
    [J]. RAPID MODELLING AND QUICK RESPONSE: INTERSECTION OF THEORY AND PRACTICE, 2010, : 47 - 59