Integrated spare parts logistics and operations planning for maintenance service providers

被引:30
|
作者
Zanjani, Masoumeh Kazemi [1 ,3 ]
Nourelfath, Mustapha [2 ,3 ]
机构
[1] Concordia Univ, Dept Mech & Ind Engn, Montreal, PQ H3G 1M8, Canada
[2] Univ Laval, Dept Mech Engn, Quebec City, PQ G1K 7P4, Canada
[3] Interuniv Res Ctr Enterprise Networks Logist & Tr, Quebec City, PQ G1V 0A6, Canada
关键词
Spare part logistics; Third-party maintenance providers; Uncertainty; Non-stationary demand; Multi-stage stochastic programming; MULTI-INDENTURE; INVENTORY; MULTIECHELON; STRATEGY; SYSTEMS;
D O I
10.1016/j.ijpe.2014.07.012
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper considers the problem of coordinated spare-part logistics and operations planning for third-party maintenance providers. Due to the multi-indenture structure of the equipment, different types of components might randomly fail to perform at different points of time. The spare part logistics literature has been focused on spare part inventory management in an in-house maintenance context. In this article, a mathematical programming model is first developed to formulate the problem in the context of a third-party maintenance provider who is faced with strict due dates for the delivery of repaired equipment. The model seeks the optimal number of maintenance jobs that can be completed to deliver at each period, as well as the order quantity of spare parts so as to minimize the procurement, inventory, and equipment late delivery costs, while taking into account the spare part supply lead-time. Next, we model the spare part demand uncertainty as a non-stationary stochastic process in each period in the planning horizon. The deterministic model is then reformulated as a multi-stage stochastic program with recourse. We also discuss the complexity of the stochastic model and propose a preprocessing approach to reduce its size for large instances. Numerical results demonstrate how the proposed model links the spare part logistics and equipment delivery decisions under spare part demand uncertainty. (C) 2014 Elsevier B.V. All rights reserved.
引用
收藏
页码:44 / 53
页数:10
相关论文
共 50 条
  • [1] Integrated Workforce Training and Operations Planning for Maintenance Service Providers
    Kafiabad, Shayan Tavakoli
    Zanjani, Masoumeh Kazemi
    Nourelfath, Mustapha
    [J]. IFAC PAPERSONLINE, 2019, 52 (13): : 613 - 618
  • [2] Determination of the Spare Parts Demand for Maintenance, Repair and Overhaul Service Providers
    Dombrowski, Uwe
    Weckenborg, Sebastian
    [J]. ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: SUSTAINABLE PRODUCTION AND SERVICE SUPPLY CHAINS, PT 1, 2013, 414 : 433 - 440
  • [3] Integrated planning of spare parts and service engineers with partial backlogging
    Rahimi-Ghahroodi, S.
    Al Hanbali, A.
    Zijm, W. H. M.
    van Ommeren, J. K. W.
    Sleptchenko, A.
    [J]. OR SPECTRUM, 2017, 39 (03) : 711 - 748
  • [4] Integrated planning of spare parts and service engineers with partial backlogging
    S. Rahimi-Ghahroodi
    A. Al Hanbali
    W. H. M. Zijm
    J. K. W. van Ommeren
    A. Sleptchenko
    [J]. OR Spectrum, 2017, 39 : 711 - 748
  • [5] Supply Chain Scenarios for Logistics Service Providers in the Context of Additive Spare Parts Manufacturing
    Pause, Daniel
    Marek, Svenja
    [J]. ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: TOWARDS SMART PRODUCTION MANAGEMENT SYSTEMS, APMS 2019, PT II, 2019, : 51 - 58
  • [6] Integrated planning of operations and on-job training in maintenance logistics networks
    Kafiabad, Shayan Tavakoli
    Zanjani, Masoumeh Kazemi
    Nourelfath, Mustapha
    [J]. RELIABILITY ENGINEERING & SYSTEM SAFETY, 2020, 199
  • [7] Software Tool for the Selection of 3D Print Service Providers in the context of Spare Parts Logistics
    Marek, Svenja
    Pause, Daniel
    Stich, Volker
    [J]. 2020 IEEE TECHNOLOGY & ENGINEERING MANAGEMENT CONFERENCE (TEMSCON 2020), 2020,
  • [8] Maintenance spare parts logistics: Special characteristics and strategic choices
    Huiskonen, J
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2001, 71 (1-3) : 125 - 133
  • [9] A review of operational spare parts service logistics in service control towers
    Topan, E.
    Eruguz, A. S.
    Ma, W.
    van der Heijden, M. C.
    Dekker, R.
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2020, 282 (02) : 401 - 414
  • [10] Joint planning of service engineers and spare parts
    Sleptchenko, Andrei
    Al Hanbali, Ahmad
    Zijm, Henk
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2018, 271 (01) : 97 - 108