Pareto Ant Colony Optimization Based Algorithm to Solve Maintenance and Production Scheduling problem in Parallel Machine Case

被引:2
|
作者
Berrichi, A. [1 ]
Mezghiche, M. [1 ]
Amodeo, L. [2 ]
Yalaoui, F. [2 ]
机构
[1] Univ Mhamed Bouguerra Boumerdes, Lifab, Boumerdes, Algeria
[2] Univ Technol Troyes, Charles Delaunay Inst, FRE CNRS 2848, Losi, Troyes, France
关键词
production scheduling; preventive maintenance (PM); multi-objective optimization; reliability; ant colony optimization;
D O I
10.1109/ICCIE.2009.5223778
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
This article presents a new method based on multi- objective Pareto ant colony optimization to resolve the joint production and maintenance scheduling problem. This method is applied to the problem previously developed in [2] for the parallel machines case. This problem was formulated according to a bi- objective approach to find trade-off solutions between both objectives of production and maintenance. Reliability Models were used to take into account the maintenance aspect in the model. Two genetic algorithms were compared to approximate the Pareto front. Here, we propose a new algorithm based on Pareto ant colony optimization to improve the solutions quality found in the previous study. The goal is to simultaneously determine the best assignment of production tasks to machines by minimizing the makespan as well as the best periods of preventive maintenance (PM) of the machines by minimizing the unavailability of the production system. The experiments carried out show an improvement of the previous results.
引用
收藏
页码:1210 / +
页数:2
相关论文
共 50 条
  • [1] Ant Colony Optimization Algorithm to Parallel Machine Scheduling Problem with Setups
    Arnaout, Jean-Paul
    Musa, Rami
    Rabadi, Ghaith
    [J]. 2008 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING, VOLS 1 AND 2, 2008, : 578 - +
  • [2] An Ant Colony Optimization algorithm to solve a 2-machine bicriteria flowshop scheduling problem
    T'kindt, V
    Monmarché, N
    Tercinet, F
    Laügt, D
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2002, 142 (02) : 250 - 257
  • [3] An ant colony optimization approach for the parallel machine scheduling problem with outsourcing allowed
    Roberto Fernandes Tavares Neto
    Moacir Godinho Filho
    Fabio Molina da Silva
    [J]. Journal of Intelligent Manufacturing, 2015, 26 : 527 - 538
  • [4] An ant colony optimization approach for the parallel machine scheduling problem with outsourcing allowed
    Tavares Neto, Roberto Fernandes
    Godinho Filho, Moacir
    da Silva, Fabio Molina
    [J]. JOURNAL OF INTELLIGENT MANUFACTURING, 2015, 26 (03) : 527 - 538
  • [5] An integrated ant colony optimization algorithm to solve job allocating and tool scheduling problem
    Zhang, Xu
    Wang, Shilong
    Yi, Lili
    Xue, Hong
    Yang, Songsong
    Xiong, Xin
    [J]. PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE, 2018, 232 (01) : 172 - 182
  • [6] Ant colony optimization algorithm with multiple visibility matrices to solve an industrial scheduling problem
    Gagné, C
    Gravel, M
    Price, WL
    [J]. INFOR, 2002, 40 (03) : 259 - 276
  • [7] Ant colony optimization for unrelated parallel machine scheduling
    Lin, Chi-Wei
    Lin, Yang-Kuei
    Hsieh, Han-Ting
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 67 (1-4): : 35 - 45
  • [8] Ant colony optimization for unrelated parallel machine scheduling
    Chi-Wei Lin
    Yang-Kuei Lin
    Han-Ting Hsieh
    [J]. The International Journal of Advanced Manufacturing Technology, 2013, 67 : 35 - 45
  • [9] Fuzzy Aided Ant Colony Optimization Algorithm to Solve Optimization Problem
    George, Aloysius
    Rajakumar, B. R.
    [J]. INTELLIGENT INFORMATICS, 2013, 182 : 207 - 215
  • [10] Scheduling in parallel machine shop: An Ant Colony Optimization approach
    Sankar, S. Saravana
    Ponnambalam, S. G.
    Rathinavel, V.
    Visveshvaren, M. S.
    [J]. 2005 IEEE International Conference on Industrial Technology - (ICIT), Vols 1 and 2, 2005, : 340 - 344