Risk assessment of physical unit operations of wastewater treatment plant using fuzzy FMEA method: a case study in the northwest of Iran

被引:10
|
作者
Alizadeh, Seyed Shamseddin [1 ]
Solimanzadeh, Yaghoob [2 ]
Mousavi, Saeid [3 ]
Safari, Gholam Hossein [4 ,5 ]
机构
[1] Tabriz Univ Med Sci, Sch Publ Hlth, Dept Occupat Hlth Engn, Tabriz, Iran
[2] Tabriz Univ Med Sci, Student Res Comm, Tabriz, Iran
[3] Tabriz Univ Med Sci, Sch Publ Hlth, Dept Stat & Epidemiol, Tabriz, Iran
[4] Tabriz Univ Med Sci, Hlth & Environm Res Ctr, Tabriz, Iran
[5] Tabriz Univ Med Sci, Sch Publ Hlth, Dept Environm Hlth Engn, Tabriz, Iran
关键词
Risk assessment; Municipal wastewater; Screening; Grit removal; Fuzzy FMEA; FAILURE MODE; ENVIRONMENT; HEALTH; SAFETY;
D O I
10.1007/s10661-022-10248-9
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Failure Mode and Effects Analysis (FMEA) is one of the most used methods in risk assessment and prioritization. This study was conducted to identify, evaluate, prioritize, and analyze risks associated with the physical processes of Sahand municipal wastewater plant using traditional and fuzzy FMEA methods. The present research was a cross-sectional analytical study that was conducted to prioritize the risks of unit operations of screening and grit removal in Sahand municipal wastewater treatment plant for 6 months. First, a team of five experts was formed and the traditional FMEA worksheet was completed. Then, the fuzzy membership functions were determined according to experts' opinions and using the MATLAB program, and the severity, occurrence, detection, and risk priority number (RPN) became fuzzy and risks were prioritized according to the fuzzy logic outputs. A total of 53 failure modes were identified for screening (26 failures) and grit removal units (27 failures) using the traditional FMEA risk assessment technique. The results of the traditional FMEA method showed that among the 53 identified failure modes, in physical treatment equipment of Sahand municipal wastewater, 51 failures (96.2%) were in the low-risk levels and two failures (3.8%) were in the medium-risk levels. According to the results of the fuzzy FMEA, 5 failures (9.4%) were in the low-risk levels, 43 failures (81.2%) were in the medium-risk levels, and 5 failures (9.4%) were in the high-risk levels. Based on the traditional FMEA, the highest and lowest level of risk belonged to manual screening clogging and conveyor cutting of mechanical screening with RPN of 540 and 12, respectively, whereas in the fuzzy FMEA, the highest and lowest level of risk were related to manual screening clogging and fracture of pump pipes with RPN of 894 and 105, respectively. The finding showed that risk assessment using fuzzy FMEA provides more accurate and better results than traditional FMEA. In the fuzzy FMEA, the involvement of the experts' opinions in risk assessment and fuzzy models leads to more realistic results, as well as corrective action prioritization is better performed.
引用
收藏
页数:15
相关论文
共 50 条
  • [1] Risk assessment of physical unit operations of wastewater treatment plant using fuzzy FMEA method: a case study in the northwest of Iran
    Seyed Shamseddin Alizadeh
    Yaghoob Solimanzadeh
    Saeid Mousavi
    Gholam Hossein Safari
    [J]. Environmental Monitoring and Assessment, 2022, 194
  • [2] Environment risk assessment of wastewater treatment using FMEA method based on Pythagorean fuzzy multiple-criteria decision-making
    Bonab, Shabnam Rahnamay
    Osgooei, Elnaz
    [J]. ENVIRONMENT DEVELOPMENT AND SUSTAINABILITY, 2022,
  • [3] Medical device software risk assessment using FMEA and fuzzy linguistic approach: case study
    Batbayar, Khulan
    Takacs, Marta
    Kozlovszky, Miklos
    [J]. 2016 IEEE 11TH INTERNATIONAL SYMPOSIUM ON APPLIED COMPUTATIONAL INTELLIGENCE AND INFORMATICS (SACI), 2016, : 197 - 201
  • [4] Fuzzy FMEA for the safety risk analysis of underground coal mining (a case study in Iran)
    Rahimdel, Mohammad Javad
    Aryafar, Ahmad
    Vaziri, Solmaz
    [J]. MINING TECHNOLOGY-TRANSACTIONS OF THE INSTITUTIONS OF MINING AND METALLURGY, 2022, 131 (02) : 104 - 114
  • [5] Data on wastewater treatment plant by using wetland method, Babol, Iran
    Shahamat, Yousef Dadban
    Asgharnia, Hosseinali
    Kalankesh, Laleh R.
    Hosanpour, Mehdi
    [J]. DATA IN BRIEF, 2018, 16 : 1056 - 1061
  • [6] An integrated of fuzzy-WASPAS and E-FMEA methods for environmental risk assessment: a case study of petrochemical industry, Iran
    Farkhondeh Ebadzadeh
    Seyed Masoud Monavari
    Seyed Ali Jozi
    Maryam Robati
    Razieh Rahimi
    [J]. Environmental Science and Pollution Research, 2023, 30 : 40315 - 40326
  • [7] An integrated of fuzzy-WASPAS and E-FMEA methods for environmental risk assessment: a case study of petrochemical industry, Iran
    Ebadzadeh, Farkhondeh
    Monavari, Seyed Masoud
    Jozi, Seyed Ali
    Robati, Maryam
    Rahimi, Razieh
    [J]. ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH, 2023, 30 (14) : 40315 - 40326
  • [8] Dynamic Failure Risk Assessment of Wastewater Treatment and Reclamation Plant: An Industrial Case Study
    Analouei, Razieh
    Taheriyoun, Masoud
    Amin, Md Tanjin
    [J]. SAFETY, 2022, 8 (04)
  • [9] Life cycle assessment, a decision-making tool in wastewater treatment systems: a case study wastewater treatment plant of Ahvaz, Iran
    Tayyebi, Fatemeh
    Golabi, Mona
    Jaafarzadeh, Neematollah
    [J]. APPLIED WATER SCIENCE, 2023, 13 (06)
  • [10] Life cycle assessment, a decision-making tool in wastewater treatment systems: a case study wastewater treatment plant of Ahvaz, Iran
    Fatemeh Tayyebi
    Mona Golabi
    Neematollah Jaafarzadeh
    [J]. Applied Water Science, 2023, 13