共 34 条
- [1] Integrated Batch Planning Model and Algorithm for Steelmaking-continuous Casting-hot Rolling [J]. ICIEA: 2009 4TH IEEE CONFERENCE ON INDUSTRIAL ELECTRONICS AND APPLICATIONS, VOLS 1-6, 2009, : 977 - +
- [2] LR-based integrated model for scheduling steelmaking-continuous casting-hot rolling [J]. NEW TECHNOLOGIES FOR AUTOMATION OF METALLURGICAL INDUSTRY 2003, 2004, : 107 - 112
- [3] Multi-Agent Based Simulation System Modelling for Steelmaking-Continuous Casting Production Process [J]. PROCEEDINGS OF THE 2012 24TH CHINESE CONTROL AND DECISION CONFERENCE (CCDC), 2012, : 170 - 173
- [4] An Integrated Planning Approach based on Harmony Search Algorithm and Prediction Model for Steelmaking-Continuous Casting-Hot Rolling Process [J]. 2014 11TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION (WCICA), 2014, : 1811 - 1817
- [5] Research and Application of Integrated Scheduling System of Steelmaking-Continuous Casting-Hot Rolling in Shagang Group [J]. MECHANICAL ENGINEERING AND TECHNOLOGY, 2012, 125 : 477 - 483
- [8] Hybrid Metaheuristic for Multi-objective Steelmaking-Continuous Casting Scheduling [J]. 2017 10TH INTERNATIONAL SYMPOSIUM ON COMPUTATIONAL INTELLIGENCE AND DESIGN (ISCID), VOL. 1, 2017, : 236 - 240
- [9] Model and Algorithm of Integrated Lot Planning for Steelmaking-Continous Casting-Hot Rolling [J]. CCDC 2009: 21ST CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-6, PROCEEDINGS, 2009, : 5105 - 5110