共 50 条
- [7] Group Elevator Scheduling during High-rise Building Evacuation PROCEEDINGS OF ISCRAM ASIA 2012 CONFERENCE ON INFORMATION SYSTEMS FOR CRISIS RESPONSE AND MANAGEMENT, 2012, : 229 - 235
- [8] H∞ robust tracking of vertical motions in high-rise elevator ICEMS 2005: Proceedings of the Eighth International Conference on Electrical Machines and Systems, Vols 1-3, 2005, : 1632 - 1635
- [9] Simplified analysis of asymmetric high-rise structures with cores STRUCTURAL DESIGN OF TALL BUILDINGS, 2002, 11 (02): : 93 - 107
- [10] Systems with rigidity cores and high-rise buildings outriggers XXVII R-S-P SEMINAR, THEORETICAL FOUNDATION OF CIVIL ENGINEERING (27RSP) (TFOCE 2018), 2018, 196