Receding horizon load restoration for coupled transmission and distribution system considering load-source uncertainty

被引:29
|
作者
Zhao, Jin [1 ]
Liu, Yao [1 ]
Wang, Hongtao [1 ]
Wu, Qiuwei [1 ,2 ]
机构
[1] Shandong Univ, Sch Elect Engn, Jinan 250000, Shandong, Peoples R China
[2] Tech Univ Denmark, Ctr Elect Power & Energy, Dept Elect Engn, DK-2800 Lyngby, Denmark
基金
国家重点研发计划;
关键词
Model predictive control; Power system restoration; Transmission and distribution system; Uncertainty management; DISTRIBUTION CIRCUITS; UNIT COMMITMENT; WIND POWER; RISK;
D O I
10.1016/j.ijepes.2019.105517
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper proposes a conditional value-at-risk (CVaR) based two-stage model predictive control (MPC) method for efficient dynamic load restoration decision-making in the coupled transmission and distribution (TS-DS) system with renewable energy. The CVaR values are employed to describe uncertainties of the load and source sides. It benefits on-line load restoration with uncertainties by fast uncertainty management and prediction error correction. In order to improve the computation of the multi-step load restoration optimization in the coupled TS-DS system, a two-stage load restoration model is constructed with the first stage relaxed multi-step optimization and the second stage single-step tracing optimization. By solving linear programming (LP), mixed integer linear programming (MILP) and mixed integer quadratic programming (MIQP) problems, the proposed CVaR based two-stage MPC method achieves on-line receding horizon load restoration of the coupled TS-DS system facing with load-source uncertainty. The effectiveness of the proposed method is validated using the IEEE-118 and IEEE-33 test systems, and a real-world coupled TS-DS system.
引用
收藏
页数:14
相关论文
共 50 条
  • [1] Dstatcom allocation in the distribution system considering load uncertainty
    Akbari-Zadeh, Mohammad-Reza
    Kokabi, Reza
    Gerami, Shahin
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2014, 27 (02) : 691 - 700
  • [2] An Optimal Source-Load Coordinated Restoration Method Considering Double Uncertainty
    Jiang, Ping
    Chen, Qiwei
    ENERGIES, 2018, 11 (03):
  • [3] Reliability Evaluation of Distribution Network Considering Source-load Uncertainty
    Lang, Jinqi
    Zhang, Junfang
    Li, Yantao
    Kuang, Chuan
    He, Cong
    Li, Zhuangzhuang
    2024 6TH ASIA ENERGY AND ELECTRICAL ENGINEERING SYMPOSIUM, AEEES 2024, 2024, : 234 - 239
  • [4] Fully parallel decentralized load restoration in coupled transmission and distribution system with soft open points
    Zhang, Tao
    Mu, Yunfei
    Dong, Lei
    Jia, Hongjie
    Pu, Tianjiao
    Wang, Xinying
    APPLIED ENERGY, 2023, 349
  • [5] Decentralized Data-Driven Load Restoration in Coupled Transmission and Distribution System With Wind Power
    Zhao, Jin
    Wu, Qiuwei
    Hatziargyriou, Nikos D.
    Li, Fangxing
    Teng, Fei
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2021, 36 (05) : 4435 - 4444
  • [6] Reliability Evaluation of DC Distribution Network Considering Uncertainty of Source-Load
    Guo, Yugang
    Han, Xiaoqing
    Liang, Dingkang
    Chang, Xiao
    Zhao, Jun
    Li, Shengwen
    Fan, Rui
    Zhang, Min
    PROCEEDINGS OF 2019 IEEE 3RD INTERNATIONAL ELECTRICAL AND ENERGY CONFERENCE (CIEEC), 2019, : 78 - 83
  • [7] Flexible planning of active distribution network expansion considering source and load uncertainty
    Cai J.
    Zhang T.
    Wang C.
    Xie N.
    Zhu B.
    Dianli Zidonghua Shebei/Electric Power Automation Equipment, 2019, 39 (10): : 109 - 115
  • [8] Restoration Strategy for Active Distribution Systems Considering Endogenous Uncertainty in Cold Load Pickup
    Li, Yujia Lauren
    Sun, Wei
    Yin, Wenqian
    Lei, Shunbo
    Hou, Yunhe
    IEEE TRANSACTIONS ON SMART GRID, 2022, 13 (04) : 2690 - 2702
  • [9] Two-stage Voltage Optimization of Flexible Interconnected Distribution System Considering Source and Load Uncertainty
    Cai H.
    Dou F.
    Wan W.
    Ge L.
    Wang W.
    Dianwang Jishu/Power System Technology, 2022, 46 (04): : 1566 - 1574