Assessment on process safety management implementation maturity among major hazard installations in Malaysia

被引:10
|
作者
Shanmugam, Kumaran [1 ,2 ]
Razak, Musab Abdul [1 ]
机构
[1] Univ Putra Malaysia, Fac Engn, Dept Chem & Environm Engn, Safety Engn Interest Grp, Serdang 43400, Selangor, Malaysia
[2] Dept Occupat Safety & Hlth, Putrajaya 62530, WP, Malaysia
关键词
Process safety management; PSM implementation assessment; Maturity model; Major hazard installation; Assessment rubric; CHEMICAL-INDUSTRY; PSM; INFORMATION; PLANT; HISTORY; JOURNEY; SYSTEM; MODEL;
D O I
10.1016/j.psep.2020.11.013
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Despite the widespread process safety management (PSM) implementation among major hazard installations (MHI) in Malaysia, an assessment on current PSM implementation maturity had never been conducted. This study aims to provide such assessment, through the utilisation of PSM elements under the OSHA PSM standard. The study first involved the measurement of PSM implementation achievement grades as well as, the development of PSM implementation related process safety maturity model and process safety assessment rubrics. Both the achievement grades and maturity model were then utilised for the assessment on PSM implementation maturity among MHI in Malaysia. Suitable recommendations for improvements in effectiveness of PSM implementation were finally proposed with reference to the assessment rubrics. From the individual PSM elements implementation assessment results, the Pre-Startup Safety Review element registered the highest representative percentage of 24 %, of MHI in Malaysia having PSM implementation maturity below the predefined acceptable maturity levels. From the overall PSM implementation assessment results, it was found that a representative percentage of 40 % of MHI in Malaysia displayed PSM implementation maturity below the similar predefined acceptable maturity levels. However, the study emphasised that future improvements to the PSM implementation maturity could be achieved through the implementation of the proposed recommendations. (c) 2020 Institution of Chemical Engineers. Published by Elsevier B.V. All rights reserved.
引用
收藏
页码:485 / 496
页数:12
相关论文
共 50 条
  • [1] Good Practices for Managing Process Safety in Major Hazard Installations and Their Networks
    Lax, Sara K.
    Ljas, Aki S.
    Leva, Kirsi M. H.
    [J]. LP2013 - 14TH SYMPOSIUM ON LOSS PREVENTION AND SAFETY PROMOTION IN THE PROCESS INDUSTRIES, VOLS I AND II, 2013, 31 : 181 - 186
  • [2] A framework of risk assessment on major hazard installations
    Zhou Liang
    Li Qiujin
    Fan Xiaohua
    [J]. PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON RISK AND RELIABILITY MANAGEMENT, VOLS I AND II, 2008, : 539 - 543
  • [3] A Framework of Vulnerability Assessment for Region Surrounding Major Hazard Installations
    Tan, Zhaoyang
    Duo, Yingquan
    Wu, Zongzhi
    [J]. THEORY AND PRACTICE OF RISK ANALYSIS AND CRISIS RESPONSE, PROCEEDINGS, 2008, : 489 - +
  • [4] Societal risk assessment of major hazard installations using QuickRisk
    Lisbona, Diego
    Januszewski, Joseph
    Balmforth, Helen
    Wardman, Mike
    [J]. PROCESS SAFETY AND ENVIRONMENTAL PROTECTION, 2011, 89 (06) : 404 - 414
  • [5] Factors influencing the safe management of contractors on major hazard installations
    Beale, CJ
    [J]. HAZARDS XVII: PROCESS SAFETY - FULFILLING OUR RESPONSIBILITIES, 2003, (149): : 719 - 731
  • [6] Process safety management and process hazard analysis implementation progress in Pakistan chemical process industries
    Rashid, Muhammad Imran
    Tabish, Asif Nadeem
    Athar, Muhammad
    [J]. PROCESS SAFETY PROGRESS, 2022, 41 (02) : 240 - 246
  • [7] Process Safety Maturity Assessment Tool
    Cranston, Joey
    [J]. PROCESS SAFETY PROGRESS, 2024, : 621 - 627
  • [8] RISK ASSESSMENT AND THE MAJOR HAZARD INDUSTRIES WITH PARTICULAR REFERENCE TO OFFSHORE INSTALLATIONS
    EDMUNDSON, JN
    FINUCANE, M
    [J]. FIRE SAFETY ENGINEERING, 1989, : 153 - 164
  • [9] Study on Risk Assessment of Major Hazard Installations for Highway Tunnel Construction
    Liu Hui
    Zhang Zhichao
    Liu Qiang
    [J]. PROGRESS IN SAFETY SCIENCE AND TECHNOLOGY, VOL. VIII, PTS A AND B, 2010, 8 : 2229 - 2235
  • [10] USE OF QUANTIFIED RISK ASSESSMENT TECHNIQUES IN RELATION TO MAJOR HAZARD INSTALLATIONS
    ELLIOTT, MJ