A robust policy for serial agile production systems

被引:3
|
作者
Iravani, SMR [1 ]
Buzacott, JA
Posner, MJM
机构
[1] Northwestern Univ, Dept Ind Engn & Management Sci, Evanston, IL 60208 USA
[2] York Univ, Schulich Sch Business, N York, ON M3J 1P3, Canada
[3] Jerusalem Coll Technol, Dept Ind Engn & Management, IL-91160 Jerusalem, Israel
关键词
tandem queues; moving servers; single-machine stochastic scheduling; setup costs;
D O I
10.1002/nav.20051
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
One of the major problems in modeling production systems is how to treat the job arrival process. Restrictive assumptions such as Markovian arrivals do not represent real world systems, especially if the arrival process is generated by job departures from upstream workstations. Under these circumstances, cost-effective policies that are robust with respect to the nature of the arrival process become of interest. In this paper, we focus on minimizing the expected total holding and setup costs in a two-stage produce-to-order production system operated by a cross-trained worker. We will show that if setup times are insignificant in comparison with processing times, then near-optimal policies can be generated with very robust performances with respect to the arrival process. We also present conditions under which these near-optimal policies can be obtained by using only the arrival and service rates. (C) 2004 Wiley Periodicals, Inc.
引用
收藏
页码:58 / 73
页数:16
相关论文
共 50 条
  • [1] Serial agile production systems with automation
    Hopp, WJ
    Iravani, SMR
    Shou, BY
    [J]. OPERATIONS RESEARCH, 2005, 53 (05) : 852 - 866
  • [2] Coupling of centralized and decentralized scheduling for robust production in agile production systems
    Minguillon, Fabio Echsler
    Lanza, Gisela
    [J]. 12TH CIRP CONFERENCE ON INTELLIGENT COMPUTATION IN MANUFACTURING ENGINEERING, 2019, 79 : 385 - 390
  • [3] THE IMPACT OF INSPECTOR FALLIBILITY ON THE INSPECTION POLICY IN SERIAL PRODUCTION SYSTEMS
    BALLOU, DP
    PAZER, HL
    [J]. MANAGEMENT SCIENCE, 1982, 28 (04) : 387 - 399
  • [4] Robust Policy Search for an Agile Ground Vehicle Under Perception Uncertainty
    Sefati, Shahriar
    Mishra, Subhransu
    Sheckells, Matthew
    Katyal, Kapil D.
    Bai, Jin
    Hager, Gregory D.
    Kobilarov, Marin
    [J]. 2021 IEEE/RSJ INTERNATIONAL CONFERENCE ON INTELLIGENT ROBOTS AND SYSTEMS (IROS), 2021, : 154 - 161
  • [5] Integrated Production Model in Agile Manufacturing Systems
    H.-H. Huang
    [J]. The International Journal of Advanced Manufacturing Technology, 2002, 20 : 515 - 525
  • [6] Integrated production model in agile manufacturing systems
    Huang, H.-H.
    [J]. 1600, Springer-Verlag London Ltd (20):
  • [7] Integrated production model in agile manufacturing systems
    Huang, HH
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2002, 20 (07): : 515 - 525
  • [8] PLANNED LEADTIMES FOR SERIAL PRODUCTION SYSTEMS
    YANO, CA
    [J]. IIE TRANSACTIONS, 1987, 19 (03) : 300 - 307
  • [9] Robust optimization for Smart Machining Systems: An enabler for agile manufacturing
    Deshayes, L.
    Welsch, L.
    Donmez, A.
    Ivester, R.
    [J]. Manufacturing Engineering and Materials Handling, 2005 Pts A and B, 2005, 16 : 407 - 416
  • [10] FLEXIBLE INSPECTION SYSTEMS FOR SERIAL MULTISTAGE PRODUCTION SYSTEMS
    VILLALOBOS, JR
    FOSTER, JW
    DISNEY, RL
    [J]. IIE TRANSACTIONS, 1993, 25 (03) : 16 - 26