Determination of optimal cut-off grade policy to optimize NPV using a new approach with optimization factor

被引:1
|
作者
Bascetin, A. [1 ]
Nieto, A.
机构
[1] Istanbul Univ, Fac Engn, Min Engn Dept, Istanbul, Turkey
[2] Virginia Polytech Inst & State Univ, Blacksburg, VA USA
关键词
D O I
暂无
中图分类号
TF [冶金工业];
学科分类号
0806 ;
摘要
One very important aspect of mining is deciding what material in a deposit is worth mining and processing, versus what material should be considered waste. This decision is summarized by the cutoff grade policy. The cut-off grade strategy for an open pit mine influences the annual cash flows and affects the net present value of a project. The optimization of cut-off grade strategy requires the knowledge of detailed operational costs, mining sequence, mining operation, processing, and product constraints, as well as the grade distribution of a given deposit defined by pit, phase, and different material types. Cut-off grade optimization algorithms have been developed in the past. The most common criteria used in cut-off grade optimization is to maximize the net present value (NPV). This paper describes the determination of a cut-off grade strategy based on Lane's algrorithm adding an optimization factor based on the generalized deduced gradient (GRG) algorithm to maximize the project's NPV. The introduced algorithm is; a windows based program developed at Virginia Tech that is based on a series of Visual Basic routines within a spreadsheet environment (Excel). The benefits of the methodology are demonstrated using a hypothetical case study.
引用
收藏
页码:87 / 94
页数:8
相关论文
共 50 条
  • [1] Optimization of the cut-off grade for underground polymetallic mines
    Liu, Di
    Li, Guoqing
    Hu, Nailian
    Xiu, Guolin
    Ma, Zhaoyang
    [J]. GOSPODARKA SUROWCAMI MINERALNYMI-MINERAL RESOURCES MANAGEMENT, 2019, 35 (01): : 25 - 42
  • [2] A probabilistic approach to the dynamic cut-off grade assessment
    Bragin, Viktor, I
    Kraritonova, Margarita Yu
    Matsko, Natalya A.
    [J]. JOURNAL OF MINING INSTITUTE, 2021, 251 : 617 - 625
  • [3] Simulation–Optimization Approach for Optimal Cut-Off Design Under the Hydraulic Structure
    Waqed H. Hassan
    Basim K. Nile
    Haider M. Zwain
    [J]. Geotechnical and Geological Engineering, 2024, 42 : 465 - 478
  • [4] A modified approach for cut-off grade and production rate optimization in block caving projects
    Shami-Qalandari, Mohammad
    Rahmanpour, Mehdi
    Amnieh, Hassan Bakhshandeh
    [J]. MINING TECHNOLOGY-TRANSACTIONS OF THE INSTITUTIONS OF MINING AND METALLURGY, 2024,
  • [5] Optimization of cut-off grade and its application for polymetallic deposits
    Li, Guo-Qing
    Hu, Nai-Lian
    Song, Xin
    [J]. Beijing Keji Daxue Xuebao/Journal of University of Science and Technology Beijing, 2010, 32 (09): : 1107 - 1112
  • [6] Optimal cut-off grade determination based on variable capacities in open-pit mining
    Abdollahisharif, J.
    Bakhtavar, E.
    Anemangely, M.
    [J]. JOURNAL OF THE SOUTHERN AFRICAN INSTITUTE OF MINING AND METALLURGY, 2012, 112 (12) : 1065 - 1069
  • [7] Incorporation of rehabilitation cost into the optimum cut-off grade determination
    Gholamnejad, J.
    [J]. JOURNAL OF THE SOUTH AFRICAN INSTITUTE OF MINING AND METALLURGY, 2009, 109 (02): : 89 - 94
  • [8] Incorporation of rehabilitation cost into the optimum cut-off grade determination
    Gholamnejad, J.
    [J]. Journal of the Southern African Institute of Mining and Metallurgy, 2009, 109 (02) : 89 - 94
  • [9] Development of a computer-aided application using Lane's algorithm to optimize cut-off grade
    Githiria, J.
    Musingwini, C.
    Muriuki, J.
    [J]. JOURNAL OF THE SOUTHERN AFRICAN INSTITUTE OF MINING AND METALLURGY, 2016, 116 (11) : 1027 - 1035
  • [10] Simulation-Optimization Approach for Optimal Cut-Off Design Under the Hydraulic Structure
    Hassan, Waqed H.
    Nile, Basim K.
    Zwain, Haider M.
    [J]. GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2024, 42 (01) : 465 - 478