A hybrid prediction model with a selectively updating strategy for iron removal process in zinc hydrometallurgy

被引:6
|
作者
Chen, Ning [1 ]
Dai, Jiayang [1 ]
Gui, Weihua [1 ]
Guo, Yuqian [1 ]
Zhou, Jiaqi [1 ]
机构
[1] Cent South Univ, Sch Informat Sci & Engn, Changsha 410083, Hunan, Peoples R China
基金
中国国家自然科学基金;
关键词
REGRESSION;
D O I
10.1007/s11432-018-9711-2
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
引用
收藏
页数:3
相关论文
共 50 条
  • [1] A hybrid prediction model with a selectively updating strategy for iron removal process in zinc hydrometallurgy
    Ning Chen
    Jiayang Dai
    Weihua Gui
    Yuqian Guo
    Jiaqi Zhou
    Science China Information Sciences, 2020, 63
  • [2] A hybrid prediction model with a selectively updating strategy for iron removal process in zinc hydrometallurgy
    Ning CHEN
    Jiayang DAI
    Weihua GUI
    Yuqian GUO
    Jiaqi ZHOU
    Science China(Information Sciences), 2020, 63 (01) : 250 - 252
  • [3] A Hybrid Control Strategy for Real-Time Control of the Iron Removal Process of the Zinc Hydrometallurgy Plants
    Xie, Shiwen
    Xie, Yongfang
    Ying, Hao
    Gui, Weihua
    Yang, Chunhua
    IEEE TRANSACTIONS ON INDUSTRIAL INFORMATICS, 2018, 14 (12) : 5278 - 5288
  • [4] An integrated predictive model with an on-line updating strategy for iron precipitation in zinc hydrometallurgy
    Xie, Yongfang
    Xie, Shiwen
    Chen, XiaoFang
    Gui, WeiHua
    Yang, Chunhua
    Caccetta, Louis
    HYDROMETALLURGY, 2015, 151 : 62 - 72
  • [5] Defining the Paragoethite process for iron removal in zinc hydrometallurgy
    Loan, M
    Newman, OMG
    Cooper, RMG
    Farrow, JB
    Parkinson, GM
    HYDROMETALLURGY, 2006, 81 (02) : 104 - 129
  • [6] Ozonation precipitation for iron removal in zinc hydrometallurgy
    Zhang, Jiale
    Wang, Tian
    Ren, Chunfang
    Zhang, Lihua
    Zhang, Libo
    Yang, Kun
    CANADIAN METALLURGICAL QUARTERLY, 2023, 62 (01) : 99 - 106
  • [7] The updating strategy for the safe control Bayesian network model under the abnormity in the thickening process of gold hydrometallurgy
    Li, Hui
    Wang, Fuli
    Li, Hongru
    Wang, Xu
    NEUROCOMPUTING, 2019, 338 : 237 - 248
  • [8] Chance constrained optimization for copper removal process under uncertainty in zinc hydrometallurgy
    Wang X.
    Zhou X.
    Yang C.
    Huagong Xuebao/CIESC Journal, 2020, 71 (03): : 1226 - 1233
  • [9] Distributed nonlinear model predictive control for cobalt removal process in zinc hydrometallurgy considering error compensation modelling
    Wang, Qianqian
    An, Aimin
    Tang, Minan
    Lu, Jiawei
    CANADIAN JOURNAL OF CHEMICAL ENGINEERING, 2024, 102 (01): : 307 - 323
  • [10] Use of Phytic Acid for the Removal of Iron in Hot Acidic Leachate from Zinc Hydrometallurgy
    Julien Comel
    Eric Meux
    Nathalie Leclerc
    Sebastien Diliberto
    Philippe Pierrat
    Herve Muhr
    JOM, 2021, 73 : 1652 - 1660