Mixed Integer Programming Model and Heuristic Algorithm for Production Planning of Continuous Casting and Hot Rolling

被引:0
|
作者
Lyu, Minhu [1 ,2 ]
Wang, Zheng [1 ,2 ]
Chan, Felix T. S. [3 ]
机构
[1] Southeast Univ, Key Lab Measure & Control Complex Syst Engn, Minist Educ, Nanjing 210096, Jiangsu, Peoples R China
[2] Southeast Univ, Sch Automat, Nanjing 210096, Jiangsu, Peoples R China
[3] Hong Kong Polytech Univ, Dept Ind & Syst Engn, Kowloon, Hong Kong, Peoples R China
关键词
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In steel industry, production planning of continuous casting and hot rolling are connected closely with each other. In addition, they are constrained by many key factors such as due date, process routes, and production capacity. Therefore, it is necessary to solve the production planning problems for continuous casting and hot rolling in an integrated way. In this research, we model the integrated production planning problem for continuous casting and hot rolling by mixed integer programming with the objective of minimizing the setup time and maximizing the utilization of devices, based on which a heuristic algorithm is developed to solve the problem. Numerical experiments are conducted to evaluate the proposed algorithm based on the data acquired from a steel plant in Jiangsu Province, China, and the results show that the proposed algorithm works quite well in integrated production planning of continuous casting and hot rolling.
引用
收藏
页码:1503 / 1508
页数:6
相关论文
共 50 条
  • [1] A mixed-integer linear programming model for the continuous casting planning
    Bellabdaoui, A.
    Teghem, J.
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2006, 104 (02) : 260 - 270
  • [2] Production planning of mixed-model assembly lines: a heuristic mixed integer programming based approach
    Tonelli, F.
    Paolucci, M.
    Anghinolfi, D.
    Taticchi, P.
    [J]. PRODUCTION PLANNING & CONTROL, 2013, 24 (01) : 110 - 127
  • [3] Unified modeling and intelligent algorithm of production planning for the process of steelmaking, continuous casting and hot rolling
    Zheng, Zhong
    Liu, Yi
    Chen, Kai
    Gao, Xiao-Qiang
    [J]. Beijing Keji Daxue Xuebao/Journal of University of Science and Technology Beijing, 2013, 35 (05): : 687 - 693
  • [4] Integrated Batch Planning Model and Algorithm for Steelmaking-continuous Casting-hot Rolling
    Guo Dongfen
    Li Fuliang
    Li Tieke
    [J]. ICIEA: 2009 4TH IEEE CONFERENCE ON INDUSTRIAL ELECTRONICS AND APPLICATIONS, VOLS 1-6, 2009, : 977 - +
  • [5] On the integer programming formulation of production scheduling optimisation algorithm for the hot rolling processes
    Alidaee, Bahram
    Wang, Haibo
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (20) : 6036 - 6039
  • [6] Production scheduling model and algorithm for steel making-continuous casting-hot rolling processes
    Zhu, Bao-Lin
    Yu, Hai-Bin
    [J]. Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2003, 9 (01): : 33 - 36
  • [7] MIXED INTEGER PROGRAMMING AND HEURISTIC ALGORITHM FOR A WAREHOUSES LOCATION PROBLEM
    BROSH, I
    HERSH, M
    SHLIFER, E
    [J]. OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1974, 2 (06): : 805 - 808
  • [8] Integrative matching model and algorithm of inventory in continuous casting and hot rolling processes
    Li, Hai-Tao
    Li, Su-Jian
    Lu, Yong-Ming
    Wu, Di
    [J]. Beijing Keji Daxue Xuebao/Journal of University of Science and Technology Beijing, 2012, 34 (10): : 1197 - 1204
  • [9] Heuristic scheduling algorithm for steelmaking - Continuous casting production
    Liu, GH
    Li, TK
    Kimura, Y
    [J]. ICIM' 2002: PROCEEDINGS OF THE SIXTH CHINA-JAPAN INTERNATIONAL CONFERENCE ON INDUSTRIAL MANAGEMENT, 2002, : 121 - 127
  • [10] A dual heuristic for mixed integer programming
    Li, Yaxian
    Ergun, Ozlem
    Nemhauser, George L.
    [J]. OPERATIONS RESEARCH LETTERS, 2015, 43 (04) : 411 - 417