共 50 条
- [1] Minimizing maximum lateness on identical parallel machines with flexible resources and machine eligibility constraints The International Journal of Advanced Manufacturing Technology, 2011, 56 : 1195 - 1204
- [2] Minimizing maximum lateness on identical parallel machines with flexible resources and machine eligibility constraints INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 56 (9-12): : 1195 - 1204
- [3] Rescheduling of Parallel Machines under Machine Failures MANUFACTURING SCIENCE AND MATERIALS ENGINEERING, PTS 1 AND 2, 2012, 443-444 : 724 - +
- [4] Scheduling on identical parallel machines to minimize total completion time with deadline and machine eligibility constraints The International Journal of Advanced Manufacturing Technology, 2009, 40 : 572 - 581
- [5] Scheduling on identical parallel machines to minimize total completion time with deadline and machine eligibility constraints INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 40 (5-6): : 572 - 581
- [6] Optimal parallel machines scheduling with machine availability and eligibility constraints The International Journal of Advanced Manufacturing Technology, 2008, 36 : 132 - 139
- [7] Optimal parallel machines scheduling with machine availability and eligibility constraints International Journal of Advanced Manufacturing Technology, 2008, 36 (1-2): : 132 - 139
- [8] Optimal parallel machines scheduling with machine availability and eligibility constraints INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2008, 36 (1-2): : 132 - 139