Study on Early Warning Mechanism on Water Inrush Hazards in Construction of High Risk Subsea Tunnel

被引:0
|
作者
Xue, Yi-Guo [1 ]
Li, Shu-Cai [1 ]
Su, Mao-Xin [1 ]
Li, Wei-Teng [1 ]
Zhao, Yan [1 ]
机构
[1] Shandong Univ, Geotech & Struct Engn Res Ctr, Jinan 250061, Shandong, Peoples R China
关键词
subsea tunnel; water inrush hazards; construction risk; early warning mechanism;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
It has more high risk than other tunnels in subsea tunnel construction for its specificity and complexity of geological conditions, and geophysical prospecting uncertainty of interpretation results impacted by overlying water body. In particular, in bad rock district, the geological hazards such as water inrush is one of the largest construction risks, which can easily lead to huge disaster and economic loss. The four-color(red, orange, yellow and green) early warning mechanism of water inrush hazards in tunnel construction is stated in the paper based on prediction of high risk subsea tunnel depending on Qingdao Jiaozhou bay subsea tunnel project, then contingency plans are formulated according to subsea tunnel four-color early warning mechanism. And corresponding project preventive measures are also made according to different early warning ranks. Early warning mechanism and methods stated above have some guiding significance to similar projects.
引用
收藏
页码:360 / 364
页数:5
相关论文
共 50 条
  • [1] Study on Four-color Early Warning Mechanism of Collapse Hazards in Subsea Tunnel
    Xue, Yiguo
    Li, Shucai
    Su, Maoxin
    Qiu, Daohong
    Tian, Hao
    [J]. PROGRESS IN STRUCTURE, PTS 1-4, 2012, 166-169 : 2814 - 2820
  • [2] Water Inrush Mechanism and Safety Control in Drilling and Blasting Construction of Subsea Tunnel
    Dai, Chunquan
    Long, Yanxia
    Lv, Yunlong
    Hou, Wenzeng
    Sui, Hongtao
    [J]. JOURNAL OF COASTAL RESEARCH, 2019, : 218 - 222
  • [3] Analysis of Water Inrush and Inflow in Subsea Tunnel
    Gao Xinjun
    Zhao Chenggang
    Liu Peng
    Wu Xiaotian
    [J]. 2010 CONFERENCE ON MODERN HYDRAULIC ENGINEERING, 2010, : 73 - 75
  • [4] Mechanism of water inrush in tunnel construction in karst area
    Li, Liping
    Tu, Wenfeng
    Shi, Shaoshuai
    Chen, Jianxun
    Zhang, Yanhuan
    [J]. GEOMATICS NATURAL HAZARDS & RISK, 2016, 7 : 35 - 46
  • [5] Study on Early Warning Method for Water Inrush in Tunnel Based on Fine Risk Evaluation and Hierarchical Advance Forecast
    Wang, Sheng
    Li, Shucai
    Li, Liping
    Shi, Shaoshuai
    Zhou, Zongqing
    Cheng, Shuai
    Hu, Huijiang
    [J]. GEOSCIENCES, 2019, 9 (09):
  • [6] A new method for risk assessment of water inrush in a subsea tunnel crossing faults
    Qiu, Daohong
    Chen, Qiqi
    Xue, Yiguo
    Su, Maoxin
    Liu, Yang
    Cui, Jiuhua
    Zhou, Binghua
    [J]. MARINE GEORESOURCES & GEOTECHNOLOGY, 2022, 40 (06) : 679 - 689
  • [7] Evolution Mechanism, Monitoring, and Early Warning Method of Water Inrush in Deep-Buried Long Tunnel
    Tu, Wenfeng
    Li, Liping
    Cheng, Shuai
    Chen, Diyang
    Yuan, Yongcai
    Chen, Yanhao
    [J]. GEOFLUIDS, 2021, 2021
  • [8] Mechanism and key controlling technology of water inrush in tunnel construction
    Li, L. P.
    Li, S. C.
    Xu, Z. H.
    Sui, B.
    Shi, S. H.
    Zhou, Y.
    Hu, C.
    Zhou, Z. Q.
    Song, S. G.
    [J]. HARMONISING ROCK ENGINEERING AND THE ENVIRONMENT, 2012, : 1729 - 1734
  • [9] STUDY ON RISK CONTROL OF WATER INRUSH IN TUNNEL CONSTRUCTION PERIOD CONSIDERING UNCERTAINTY
    Wen, Zhu
    Xia, Yuanpu
    Ji, Yuguo
    Liu, Yiming
    Xiong, Ziming
    Lu, Hao
    [J]. JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2019, 25 (08) : 757 - 772
  • [10] Research on water inrush mechanism induced by karst tunnel face with high risk
    Sun Mou
    Liu Wei-ning
    [J]. ROCK AND SOIL MECHANICS, 2011, 32 (04) : 1175 - 1180