Analysis of Specific Operation of Circulating Water System in a Power Station

被引:0
|
作者
Wan Zhong-hai [1 ,2 ]
Chen Wen [1 ]
Lu Jin [1 ,2 ]
Liu Zhuan [1 ]
Cai Wen [1 ]
Yan Tao [1 ]
机构
[1] State Grid JiangXi Elect Power Res Inst, Nanchang 330096, Jiangxi, Peoples R China
[2] Nanchang Kechen Power Test Res Co Ltd, Nanchang 330096, Jiangxi, Peoples R China
关键词
FLOW;
D O I
10.1088/1755-1315/295/4/042091
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Affected by the continuous decline of the water level and the reform of the condenser, the actual operating conditions of a company's circulating water pump seriously deviated from the design conditions. Especially in the double pump condition, only one pump can be maintained in normal operation, the other's current is obviously low and the pump body vibrates greatly, and the double pump cannot be maintained in parallel operation. After several field tests and analysis, it was found that when the running head was between the two pump-inflection points of the parallel running, due to the difference in performance between the pump bodies, one of the circulating water pumps runs normally, while the other pump has a sudden current drop and an increase in pump vibration; at the same time, the two pumps have been running for more than ten years, the performance of the equipment is aging, and the head is insufficient, which is one of the main reasons.
引用
收藏
页数:5
相关论文
共 50 条
  • [1] Research on optimal operation of circulating water system of thermal power plant
    Gu, C
    Yan, GH
    Zheng, LK
    Zhang, S
    ENERGY AND ENVIRONMENT, VOLS 1 AND 2, 2003, : 520 - 525
  • [2] KILROOT POWER STATION: DESIGN AND CONSTRUCTION OF OFFSHORE CIRCULATING WATER SYSTEM.
    Carvell, C.A.
    Roberts, F.A.
    Proceedings of the Institution of Civil Engineers (London). Part 1 - Design & Construction, 1972, 72 (pt 1): : 47 - 70
  • [3] Operation optimization analysis of circulating water treatment in thermal power plants
    Yin, Lianqing
    Ai, Zhiwei
    Cui, J.
    ADVANCES IN ENVIRONMENTAL TECHNOLOGIES, PTS 1-6, 2013, 726-731 : 1895 - 1900
  • [4] KILROOT POWER-STATION - DESIGN AND CONSTRUCTION OF OFFSHORE CIRCULATING WATER-SYSTEM
    CARVELL, CA
    ROBERTS, FA
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1982, 72 (FEB): : 47 - 70
  • [5] KILROOT-POWER-STATION - DESIGN AND CONSTRUCTION OF OFFSHORE CIRCULATING WATER-SYSTEM
    CARVELL, CA
    OREILLY, MP
    ROBERTS, FA
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1982, 72 (NOV): : 711 - 712
  • [6] Selected aspects of photovoltaic power station operation in the power system
    Lange, Andrzej
    Pasko, Marian
    PRZEGLAD ELEKTROTECHNICZNY, 2020, 96 (05): : 30 - 34
  • [7] Method for increasing net power of power plant based on operation optimization of circulating cooling water system
    Wang, Huijie
    Qiu, Baoyun
    Zhao, Fangling
    Yan, Tianxu
    ENERGY, 2023, 282
  • [8] Problems in parallel operation of compressor station and power system
    Belyaev, A.V.
    Shmur'ev, V.Y.
    Edlin, M.A.
    Gazovaya Promyshlennost, 2004, (07): : 70 - 72
  • [9] SIGNIFICANCE OF GENERATOR EXCITATION IN POWER-STATION AND POWER SYSTEM OPERATION
    PENEDER, F
    BROWN BOVERI REVIEW, 1980, 67 (01): : 20 - 21
  • [10] ANALYSIS OF EMERGENCY SITUATION AT A NUCLEAR-POWER STATION WITH OPERATION OF THE SAFETY INJECTION SYSTEM
    BERMAN, LD
    GORDON, BG
    BOGDAN, SN
    THERMAL ENGINEERING, 1983, 30 (12) : 693 - 696