共 50 条
- [1] Research of Improved Determining Target Weight Method Based on TOPSIS in Bidding Decision-Making Model 2011 3RD WORLD CONGRESS IN APPLIED COMPUTING, COMPUTER SCIENCE, AND COMPUTER ENGINEERING (ACC 2011), VOL 2, 2011, 2 : 388 - 393
- [2] Performance evaluation and bidding decision of construction enterprises based on improved TOPSIS method PROCEEDINGS OF 2009 INTERNATIONAL CONFERENCE OF MANAGEMENT SCIENCE AND INFORMATION SYSTEM, VOLS 1-4, 2009, : 604 - 607
- [4] An Improved MCDM Model with Cloud TOPSIS Method 2015 27TH CHINESE CONTROL AND DECISION CONFERENCE (CCDC), 2015, : 873 - 878
- [6] Improved TOPSIS model based on interval numbers INFORMATION TECHNOLOGY AND INDUSTRIAL ENGINEERING, VOLS 1 & 2, 2014, : 55 - 61
- [8] Improvement of bidding procurement model of engineering materials based on analytical hierarchy process and Delphi method Computer Modelling and New Technologies, 2014, 18 (12): : 1095 - 1100
- [9] A new assessment method based on fuzzy linguistic of Engineering bidding risk prediction model. PROCEEDINGS OF THE 2ND INTERNATIONAL CONFERENCE ON ELECTRONIC & MECHANICAL ENGINEERING AND INFORMATION TECHNOLOGY (EMEIT-2012), 2012, 23
- [10] An Improved Method of Housing Appraisal Based on GIS and Hedonic Pricing Model in China Proceedings of 2008 International Conference on Construction & Real Estate Management, Vols 1 and 2, 2008, : 493 - 496