Tsunami assessment for risk management at nuclear power facilities in Japan

被引:16
|
作者
Yanagisawa, Ken
Imamura, Fumlhiko
Sakakiyama, Tsutomu
Annaka, Tadashi
Takeda, Tomoyoshi
Shuto, Nobuo
机构
[1] Tokyo Elect Power Co Ltd, Chiyoda Ku, Tokyo 1008560, Japan
[2] Tohoku Univ, Disaster Control Res Ctr, Aoba Ku, Sendai, Miyagi 9808579, Japan
[3] Cent Res Inst Elect Power Ind, Abiko, Chiba 2701166, Japan
[4] Tokyo Elect Power Serv Co Ltd, Taito Ku, Tokyo 1100015, Japan
[5] Nihon Univ, Adv Res Inst Sci & Humanities, Chiyoda Ku, Tokyo 1028251, Japan
关键词
tsunami assessment; design tsunami; standard fault model; nuclear power facility;
D O I
10.1007/s00024-006-0176-1
中图分类号
P3 [地球物理学]; P59 [地球化学];
学科分类号
0708 ; 070902 ;
摘要
The present study focuses on evaluation of the maximum and minimum water levels caused by tsunamis as risk factors for operation and management at nuclear power facilities along the coastal area of Japan. Tsunamis generated by submarine earthquakes are examined, basing literature reviews and databases of information on historical tsunami events and run-up heights. For simulation of water level along the coast, a numerical calculation system should be designed with computational regions covering a particular site. Also the calculation system should be verified by comparison of historical and calculated tsunami heights. At the beginning of the tsunami assessment, the standard faults, their locations, mechanisms and maximum magnitudes should be carefully estimated by considering historical earthquake-induced tsunamis and seismo-tectonics at each area. Secondly, the range of errors in the model parameters should be considered since earthquakes and tsunamis are natural phenomena that involve natural variability as well as errors in estimating parameters. For these reasons, uncertainty-induced errors should be taken into account in the process of tsunami assessment with parametric study of the tsunami source model. The element tsunamis calculated by the standard fault models with the errors would be given for the design. Then, the design tsunami can be selected among the element tsunamis with the most significant impact, maximum and minimum water levels, on the site, bearing in mind the possible errors in the numerical calculation system. Finally, the design tsunami is verified by comparison with the run-up heights of historical tsunamis, ensuring that the design tsunami is selected as the highest of all historical and possible future tsunamis at the site.
引用
收藏
页码:565 / 576
页数:12
相关论文
共 50 条
  • [1] Tsunami Assessment for Risk Management at Nuclear Power Facilities in Japan
    Ken Yanagisawa
    Fumihiko Imamura
    Tsutomu Sakakiyama
    Tadashi Annaka
    Tomoyoshi Takeda
    Nobuo Shuto
    [J]. Pure and Applied Geophysics, 2007, 164 : 565 - 576
  • [2] RISK ASSESSMENT AND RISK MANAGEMENT IN JAPAN
    KAGAWA, J
    [J]. TOXICOLOGY AND INDUSTRIAL HEALTH, 1991, 7 (5-6) : 347 - 350
  • [3] Risk Assessment,Management and Application in Nuclear Power Plant Operation
    圣国龙
    邱艳荣
    李琼哲
    [J]. Journal of Donghua University(English Edition), 2014, 31 (06) : 895 - 898
  • [4] A method for tsunami risk assessment: a case study for Kamakura, Japan
    Non Okumura
    Sebastiaan N. Jonkman
    Miguel Esteban
    Bas Hofland
    Tomoya Shibayama
    [J]. Natural Hazards, 2017, 88 : 1451 - 1472
  • [5] A method for tsunami risk assessment: a case study for Kamakura, Japan
    Okumura, Non
    Jonkman, Sebastiaan N.
    Esteban, Miguel
    Hofland, Bas
    Shibayama, Tomoya
    [J]. NATURAL HAZARDS, 2017, 88 (03) : 1451 - 1472
  • [6] Tsunami Vulnerability Criteria for Fishery Port Facilities in Japan
    Imai, Kentaro
    Inazumi, Takatomi
    Emoto, Kuniaki
    Horie, Takehito
    Suzuki, Akira
    Kudo, Keita
    Ogawa, Masami
    Noji, Masataka
    Mizuto, Keisuke
    Sasaki, Takayuki
    [J]. GEOSCIENCES, 2019, 9 (10):
  • [7] Field survey of south Java']Java tsunami, Indonesia, and tsunami hazard assessment for tsunami risk management
    Kojika, Kenpei
    Suzuki, Koji
    [J]. STRATEGY AND IMPLEMENTATION OF INTEGRATED RISK MANAGEMENT, 2007, : 421 - 425
  • [8] Risk Management and Technology: Case Studies of Tsunami Evacuation Drills in Japan
    Sun, Yingying
    Yamori, Katsuya
    [J]. SUSTAINABILITY, 2018, 10 (09)
  • [9] Evaluation of tsunami risk at the site of Ulchin Nuclear Power Plant in Korea
    Lee, HY
    Lee, DS
    Choi, WH
    [J]. PROCEEDINGS OF THE FIRST ASIAN AND PACIFIC COASTAL ENGINEERING CONFERENCE, VOLS 1 AND 2 (APACE 2001), 2001, : 1032 - 1041
  • [10] Distinctive Stochastic Tsunami Hazard and Environmental Risk Assessment of Akkuyu Nuclear Power Plant by Monte Carlo Simulations
    Yavuz, Cuneyt
    [J]. ARABIAN JOURNAL FOR SCIENCE AND ENGINEERING, 2023, 48 (01) : 573 - 582