Planning Method for Regenerative Electric Heating System Considering the Heat Load during Power Outage

被引:0
|
作者
Chen, Wanqing [1 ]
Lin, Xiaofan [1 ]
Li, Yuanfei [1 ]
Chen, Keren [1 ]
Chen, Guannan [1 ]
Chen, Han [1 ]
Chen, Simin [1 ]
Chen, Jinchun [1 ]
机构
[1] State Grid Fujian Elect Power Co, Power Econ Res Inst, Fuzhou, Peoples R China
关键词
regenerative electric heating; power outage; integrated energy system; two-layer planning;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
A two-layer planning method for regenerative electric heating considering the heat load during power outage was proposed. Firstly, the model of regenerative electric heating system was established. Then, the heat load model during power outage was established. On this basis, the optimal planning model was proposed, which took the minimum daily operation cost as the objective function. Finally, a typical regenerative electric heating systems was used as a test system to illustrate the effectiveness of the method. The case results showed that the proposed method can effectively satisfy the heat load during power outage.
引用
收藏
页码:564 / 568
页数:5
相关论文
共 50 条
  • [1] Day-ahead Optimal Scheduling Method for Regenerative Electric Heating Considering Thermal Demand of Users During Power Outage
    Zhang J.
    Mu Y.
    Jia H.
    Huo X.
    Li S.
    Fan R.
    Mu, Yunfei (yunfeimu@tju.edu.cn), 1600, Automation of Electric Power Systems Press (44): : 15 - 22
  • [2] Heat and power load dispatching considering energy storage of district heating system and electric boilers
    Huang, Xianzheng
    Xu, Zhaofeng
    Sun, Yong
    Xue, Yali
    Wang, Zhe
    Liu, Zhijun
    Li, Zhenyuan
    Ni, Weidou
    JOURNAL OF MODERN POWER SYSTEMS AND CLEAN ENERGY, 2018, 6 (05) : 992 - 1003
  • [3] Heat and power load dispatching considering energy storage of district heating system and electric boilers
    Xianzheng HUANG
    Zhaofeng XU
    Yong SUN
    Yali XUE
    Zhe WANG
    Zhijun LIU
    Zhenyuan LI
    Weidou NI
    Journal of Modern Power Systems and Clean Energy, 2018, 6 (05) : 992 - 1003
  • [4] Regenerative Electric Heating Load Modeling Considering Users' Response Behavior Biases
    Zhang, Ruicong
    Liu, Haoming
    Chen, Wei
    2020 IEEE STUDENT CONFERENCE ON ELECTRIC MACHINES AND SYSTEMS (SCEMS 2020), 2020, : 424 - 429
  • [5] Load Modeling of Regenerative Electric Boiler Considering Inconsistency of Heat Transfer
    Zhang L.
    Wang H.
    Yan G.
    Qi R.
    Han Z.
    Zhang Z.
    Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2023, 47 (13): : 40 - 46
  • [6] Composite power system expansion planning considering outage cost
    Choi, Jaeseok
    Tran, Trungtinh
    Mount, T. D.
    Thomas, R.
    2007 IEEE POWER ENGINEERING SOCIETY GENERAL MEETING, VOLS 1-10, 2007, : 2958 - +
  • [7] Research on location planning of electric heating equipment connected to distribution power system based on load distribution method
    Guo, Xiaoxuan
    Chen, Biyun
    Zhang, Yongjun
    Shu, Jie
    Chi, Jingmin
    Hu, Jinlu
    2022 IEEE 9TH INTERNATIONAL CONFERENCE ON POWER ELECTRONICS SYSTEMS AND APPLICATIONS, PESA, 2022,
  • [8] Comprehensive power-supply planning for active distribution system considering cooling, heating and power load balance
    Shen, Xinwei
    Han, Yingduo
    Zhu, Shouzhen
    Zheng, Jinghong
    Li, Qingsheng
    Nong, Jing
    JOURNAL OF MODERN POWER SYSTEMS AND CLEAN ENERGY, 2015, 3 (04) : 485 - 493
  • [9] Joint planning of distribution network and substation considering the effect of electric heating load
    Zhang, Zhi
    Liu, Jingxiong
    Duan, Xi
    Zhang, Yanhui
    Zhao, Haibo
    Sun, Chongbo
    Yi, Yinsi
    Li, Qi
    2019 5TH INTERNATIONAL CONFERENCE ON ADVANCES IN ENERGY RESOURCES AND ENVIRONMENT ENGINEERING (ICAESEE 2019), 2020, 446
  • [10] Load Modeling Methodologies for Cascading Outage Simulation Considering Power System Stability
    Song, Jiajia
    Cotilla-Sanchez, Eduardo
    Brekken, Ted K. A.
    2013 1ST IEEE CONFERENCE ON TECHNOLOGIES FOR SUSTAINABILITY (SUSTECH), 2013, : 78 - 85