Holonic Construction Management: Unified Framework for ICT-Supported Process Control

被引:20
|
作者
Zekavat, Payam R. [1 ]
Moon, Sungkon [1 ]
Bernold, Leonhard E. [2 ]
机构
[1] Univ New S Wales, Sch Civil & Environm Engn, Sydney, NSW 2052, Australia
[2] Univ Tecn FSM, Dept Civil Engn, Valparaiso 1680, Chile
关键词
Holarchy; Holonic construction management; Rebar supply; Master bundle; Blind lift; Video interface; Hands-free intercom; Electronic construction kiosk; Crane safety; SYSTEM; PROPAGATION; PROJECTS; CRANES; MODEL;
D O I
10.1061/(ASCE)ME.1943-5479.0000316
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Communication in construction still depends on a communication network much like the Romans used, face-to-face meetings and paper. Not surprisingly, this situation has been identified as an inhibitor to increasing productivity and a source of miscommunication, rework, and avoidable accidents. This paper will present a holonic construction management (HCM) model allowing the inclusion of multitype holons organized in resource clusters as well as flowing construction material carrying with it critical information. HCM was successfully tested to provide smooth interface between five different types of holons: (1)equipment, (2)human laborer/operator, (3)material, (4)three-dimensional (3D) space, and (5)information/supply logistics. Results also illustrate the potential of the HCM to integrate the many information and communication technology (ICT) applications into a resilient construction environment where electronic designs are turned into physical products. The results of initial site observations as well as safety statistics were used to identify the most important problem areas. Comparative work studies provided the means to measure differences in performance between traditional and HCM-enhanced approaches. The analysis of the field study results highlighted the effectiveness of a key element of HCM, the creation of new communication corridors between previously disconnected production units or holon. The hardware testing under field conditions highlighted the difficulties of embedding modern ICT systems into the rugged environment of construction as well as the human responses to the changes. Finally, the successful realization of HCM for the rebar supply management emphasized the need for a reevaluation of the traditional contractual relationships as the large gains will not benefit all the participants evenly. (C) 2014 American Society of Civil Engineers.
引用
收藏
页数:15
相关论文
共 50 条
  • [1] THE ICT-SUPPORTED UNIFIED PROCESS MODEL OF OFFSHORE OUTSOURCING OF SOFTWARE PRODUCTION: EXPLORATORY EXAMINATION AND VALIDATION
    Yalaho, Anicet
    Nahar, Nazmun
    INTERNATIONAL JOURNAL OF INNOVATION AND TECHNOLOGY MANAGEMENT, 2009, 6 (01) : 59 - 96
  • [2] The ICT-supported process of ESP instruction Comparative study
    Simonova, Ivana
    3RD CYPRUS INTERNATIONAL CONFERENCE ON EDUCATIONAL RESEARCH (CY-ICER 2014), 2014, 143 : 407 - 413
  • [3] The ICT-supported Unified Process Model of Offshore Outsourcing of Software Production: Exploratory examination and validation
    Yalaho, Anicet
    Nahar, Nazmun
    PICMET '07: PORTLAND INTERNATIONAL CENTER FOR MANAGEMENT OF ENGINEERING AND TECHNOLOGY, VOLS 1-6, PROCEEDINGS: MANAGEMENT OF CONVERGING TECHNOLOGIES, 2007, : 1466 - 1483
  • [4] Sustainable learning in organizations: a psychosocial ICT-supported process
    D'Aprile, Gianvito
    Loperfido, Fedela Feldia
    Talo, Cosimo
    QWERTY, 2014, 9 (01): : 50 - 64
  • [5] Risk Management in Offshore Outsourcing of Software Production Using the ICT-Supported Unified Process Model: A Cross-case Study
    Yalaho, Anicet
    Nahar, Namun
    2008 PORTLAND INTERNATIONAL CONFERENCE ON MANAGEMENT OF ENGINEERING & TECHNOLOGY, VOLS 1-5, 2008, : 1721 - 1748
  • [6] Possibilities of ICT-supported services in the clinical management of older adults
    Vollenbroek-Hutten, Miriam
    Jansen-Kosterink, Stephanie
    Tabak, Monique
    Feletti, Luca Carlo
    Zia, Gianluca
    N'dja, Aurele
    Hermens, Hermie
    AGING CLINICAL AND EXPERIMENTAL RESEARCH, 2017, 29 (01) : 49 - 57
  • [7] Possibilities of ICT-supported services in the clinical management of older adults
    Miriam Vollenbroek-Hutten
    Stephanie Jansen-Kosterink
    Monique Tabak
    Luca Carlo Feletti
    Gianluca Zia
    Aurèle N’dja
    Hermie Hermens
    Aging Clinical and Experimental Research, 2017, 29 : 49 - 57
  • [8] A case study of developing ICT-supported pedagogy through a collegial practice transfer process
    Lakkala, Minna
    Ilomaki, Liisa
    COMPUTERS & EDUCATION, 2015, 90 : 1 - 12
  • [9] Hairy Goals in Change Management: The Case of Implementing ICT-Supported Task Planning in a Hospital Setting
    Bjaalid, Gunhild
    Laudal, Thomas
    Mikkelsen, Aslaug
    JOURNAL OF CHANGE MANAGEMENT, 2015, 15 (04) : 274 - 307
  • [10] Key Success Factors for Managing Offshore Outsourcing of Software Production Using the ICT-Supported Unified Process Model: A Case Experience from Finland, India, Nepal and Russia
    Yalaho, Anicet
    Nahar, Nazmun
    PICMET 2010: TECHNOLOGY MANAGEMENT FOR GLOBAL ECONOMIC GROWTH, 2010,