The Maryland bridge retainer: A modification of a Maryland bridge

被引:2
|
作者
Kravilz, Neal D. [1 ]
机构
[1] 25055 Riding Plaza,Suite 110, South Riding, VA 20152 USA
关键词
MAXILLARY LATERAL INCISORS; RESIN-BONDED RETAINERS; FIXED PARTIAL DENTURES; CAST METAL; SEMIPERMANENT REPLACEMENT; SURVIVAL;
D O I
10.1016/j.ajodo.2019.08.007
中图分类号
R78 [口腔科学];
学科分类号
1003 ;
摘要
Preservation of the maxillary lateral incisor space after orthodontic treatment in an adolescent patient traditionally requires the use of a retainer with a lateral pontic, commonly referred to as a "flipper," which is minimally effective in the long term. This article illustrates a technique for chairside fabrication of a Maryland bridge retainer for semi-permanent retention. A stainless steel braided palatal wire is bonded to the anterior teeth. A pontic is then built intraorally with flowable composite, using the palatal wire as scaffolding. The retainer is maintained until the patient is of age for a more permanent restoration.
引用
收藏
页码:128 / 131
页数:4
相关论文
共 50 条
  • [1] THE MARYLAND BRIDGE - A USEFUL MODIFICATION
    DUMMER, PMH
    GIDDEN, J
    JOURNAL OF DENTISTRY, 1986, 14 (01) : 42 - 43
  • [2] RETENTION-ADHESION BRIDGE (MODIFIED MARYLAND BRIDGE)
    LUNDERSHAUSEN, K
    DEUTSCHE ZAHNARZTLICHE ZEITSCHRIFT, 1984, 39 (05): : 408 - 412
  • [3] Maryland bridge passes the test of time
    不详
    JOURNAL OF THE AMERICAN DENTAL ASSOCIATION, 1997, 128 (01): : 18 - 18
  • [4] The procera maryland bridge: A case report
    Holt, Larry R.
    Drake, Billy
    JOURNAL OF ESTHETIC AND RESTORATIVE DENTISTRY, 2008, 20 (03) : 165 - 171
  • [5] The procera Maryland bridge : A case report - Commentary
    Donovan, Terry
    JOURNAL OF ESTHETIC AND RESTORATIVE DENTISTRY, 2008, 20 (03) : 172 - 173
  • [6] Maryland bridge: new materials and new applications
    Savi, A.
    Tamani, M.
    Crescini, A.
    Turillazzi, O.
    DENTAL CADMOS, 2013, 81 (01) : 16 - 33
  • [7] Bridge management and inspection for the County of Baltimore, Maryland
    Shaffer, J. K.
    Schellhase, M. C.
    BRIDGE MAINTENANCE, SAFETY, MANAGEMENT AND LIFE-CYCLE OPTIMIZATION, 2010, : 666 - 673
  • [8] Bridge management and inspection system for Montgomery County, Maryland
    Shaffer, Jeremy K.
    Schellhase, Michael C.
    INNOVATIONS IN BRIDGE ENGINEERING TECHNOLOGY, 2007, : 187 - 195
  • [9] BAT-ASSOCIATED HISTOPLASMOSIS IN MARYLAND BRIDGE WORKERS
    SORLEY, DL
    LEVIN, ML
    WARREN, JW
    FLYNN, JPG
    GERSTENBLITH, J
    AMERICAN JOURNAL OF MEDICINE, 1979, 67 (04): : 623 - 626
  • [10] Structural behavior of the Bollman truss bridge at Savage, Maryland
    Ariston, L
    Lydigsen, T
    Arwade, SR
    BALTIMORE CIVIL ENGINEERING HISTORY, 2005, : 312 - 331