Transformation of water resource management: a case study of the South-to-North Water Diversion project

被引:89
|
作者
Zhao, Zhen-Yu [1 ,2 ]
Zuo, Jian [2 ,3 ]
Zillante, George [2 ]
机构
[1] North China Elect Power Univ, Sch Econ & Management, Beijing 102206, Peoples R China
[2] Univ Adelaide, Sch Architecture & Built Environm, Adelaide, SA 5005, Australia
[3] Univ Adelaide, ECIC, Adelaide, SA 5005, Australia
基金
中国国家自然科学基金;
关键词
China; South-to-North Water Diversion; Water resource management; Construction project; Case study; CORPORATE SOCIAL-RESPONSIBILITY; MEGA PROJECT; CHINA; INDUSTRY; SYSTEMS; SUCCESS; POLICY;
D O I
10.1016/j.jclepro.2015.08.066
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Water transformation plays a crucial role in the rational allocation and avoiding over-exploitation of natural resources. Mega water transformation project will not only bring opportunities for ecological and economical use of water resources, but also contribute towards regional industrial and societal transformations. The scarcity of water is a serious issue for north China, accordingly the Chinese government decided to implement the South-to-North Water Diversion project in order to transfer water from the water rich south China to China's northern region. The South-to-North Water Diversion project is the largest water diversion project in the world involving significant long distance and inter-basin water transfer features. The management of this mega project faced a number of significant challenges as it had to contend with a variety of issues including politics, the economy, society, local culture, the environment and the local ecology. This project has also drawn global attention to the question of how to coordinate, manage and implement the world's largest water resource project. This study focuses on management practices of the South-to-North Water Diversion project by investigating the project's eastern and central routes. The three project management approaches that were used in this project, i.e. project owner direct management, project consignment management, and agent construction management (Daijianzhi) were investigated. Management regulations, control measures and common issues associated with the South to-North Water Diversion project were also examined. These included: land acquisition and resettlement, bidding and tendering, construction supervision, quality management, cost management and schedule management. A questionnaire survey was conducted with key project participants in order to identify the key factors that contribute towards cost overruns and delays in the project. This is one of very limited number of studies which have in-depth investigation of mega water transformation projects in a systematic manner. The findings are expected to assist both academics and industry practitioners gain a better understanding of management practices in this mega water transformation project. This is particularly useful as the project team has to deal with a variety of sustainability related issues apart from traditional project management duties. Similarly, the lessons learnt from this case study will provide a valuable reference for the management of mega engineering projects and act as useful inputs for an international benchmarking exercise. (C) 2015 Elsevier Ltd. All rights reserved.
引用
收藏
页码:136 / 145
页数:10
相关论文
共 50 条
  • [1] The construction management of South-to-North Water Diversion Project of China
    Liu, Yuan Shu
    Yan, Fu Zhang
    He, Yuri Hua
    Gao, Yu Ping
    [J]. Proceedings of CRIOCM 2006 International Research Symposium on Advancement of Construction Management and Real Estate, Vols 1 and 2, 2006, : 847 - 853
  • [2] Preliminary Study on Water Allocation in South-to-North Water Diversion Project
    Yu, Wang
    Libin, Yang
    Hongu, Chen
    [J]. PROCEEDINGS OF THE 3RD INTERNATIONAL YELLOW RIVER FORUM ON SUSTAINABLE WATER RESOURCES MANAGEMENT AND DELTA ECOSYSTEM MAINTENANCE, VOL V, 2007, : 39 - 45
  • [3] The south-to-north water diversion (SNWD) project
    Zhang, QF
    [J]. FRONTIERS IN ECOLOGY AND THE ENVIRONMENT, 2005, 3 (02) : 76 - 76
  • [4] Pricing and Water Resource Allocation Scheme for the South-to-North Water Diversion Project in China
    Zhisong Chen
    Huimin Wang
    Xiangtong Qi
    [J]. Water Resources Management, 2013, 27 : 1457 - 1472
  • [5] Pricing and Water Resource Allocation Scheme for the South-to-North Water Diversion Project in China
    Chen, Zhisong
    Wang, Huimin
    Qi, Xiangtong
    [J]. WATER RESOURCES MANAGEMENT, 2013, 27 (05) : 1457 - 1472
  • [7] Buffer Strip Construction in South-to-North Water Diversion Project
    Chi Yixia
    Li Zhenquan
    Zhang Zhanyu
    [J]. PROCEEDINGS OF THE 4TH INTERNATIONAL YELLOW RIVER FORUM ON ECOLOGICAL CIVILIZATION AND RIVER ETHICS, VOL II, 2010, : 435 - +
  • [8] A Gateway to Rapid Prediction of Water Quality: A Case Study in China's South-to-North Water Diversion Project
    Zhang, Yuxuan
    Zhao, Ranhang
    Wang, Haofang
    Peng, Tao
    Zhao, Huaqing
    [J]. WATER, 2021, 13 (17)
  • [9] Consideration on Western Route Project for South-to-North Water Diversion
    Zhang Xuecheng
    Song Ruipeng
    Yang Jinfang
    Yuan Hua
    [J]. PROCEEDINGS OF THE 4TH INTERNATIONAL YELLOW RIVER FORUM ON ECOLOGICAL CIVILIZATION AND RIVER ETHICS, VOL II, 2010, : 281 - 286
  • [10] Longitudinal Patterns of Microbial Communities in the Water Diversion Rivers of South-to-North Water Diversion Project
    Cai, Wei
    Huang, Qiuyun
    Li, Huiyu
    Cheng, Haomiao
    Li, Yi
    Hu, Jian
    [J]. CLEAN-SOIL AIR WATER, 2022, 50 (07)