Expanding smelter capacity

被引:0
|
作者
不详
机构
来源
E&MJ-ENGINEERING AND MINING JOURNAL | 1998年 / 199卷 / 04期
关键词
D O I
暂无
中图分类号
TD [矿业工程];
学科分类号
0819 ;
摘要
引用
收藏
页码:20 / 20
页数:1
相关论文
共 50 条
  • [1] Expanding smelter capacity
    Engineering and Mining Journal, 1998, 199 (04):
  • [2] Tomago Smelter to increase its capacity
    Anon
    1600, Primedia Intertec Publishing Corp. (203):
  • [3] Expanding capacity
    Perera, Judith
    di Tigliole, Andrea Bono
    NUCLEAR ENGINEERING INTERNATIONAL, 2017, 62 (760): : 12 - 13
  • [5] Tomago smelter to increase its capacity
    不详
    E&MJ-ENGINEERING AND MINING JOURNAL, 2002, 203 (06): : 8 - 8
  • [6] SAMAG Smelter Capacity increases 18%
    不详
    METALL, 2003, 57 (05): : 269 - 270
  • [7] HEX RETROFIT ENABLES SMELTER CAPACITY EXPANSION
    Al Qassab, Hussain Ali
    Mohd, Sayed Salah Aqeel Ali
    Wedde, Geir
    Sorhuus, Anders
    LIGHT METALS 2012, 2012, : 815 - 820
  • [8] Expanding treatment capacity
    Thesing, Glenn
    Water and Wastes Digest, 2012, 52 (02): : 30 - 32
  • [9] Expanding melting capacity
    不详
    AIRCRAFT ENGINEERING AND AEROSPACE TECHNOLOGY, 2007, 79 (05): : 569 - 569
  • [10] Making improvements in smelting capacity at Onsan copper smelter
    Kang, YC
    Park, SS
    JOM-JOURNAL OF THE MINERALS METALS & MATERIALS SOCIETY, 1997, 49 (10): : 44 - +