共 42 条
- [1] Production Systems with Rework and Machine Failure Taking Place in Backorder Filling Time CISST'10: PROCEEDINGS OF THE 4TH WSEAS INTERNATIONAL CONFERENCE ON CIRCUITS, SYSTEMS, SIGNAL AND TELECOMMUNICATIONS, 2009, : 23 - +
- [2] Optimal run time for EMQ model with backordering, failure-in- rework and breakdown happening in stock-piling time WSEAS Trans. Inf. Sci. Appl., 2008, 4 (475-486):
- [3] Optimal run time for EMQ model with backordering, failure-in-rework and breakdown happening in stock-piling time PROCEEDINGS OF THE 2ND WSEAS INTERNATIONAL CONFERENCE ON CIRCUITS, SYSTEMS, SIGNALS AND TELECOMMUNICATIONS (CISST '08): CIRCUITS, SYSTEMS, SIGNAL & COMMUNICATIONS, 2008, : 169 - +