Bioreactor septic tank for on-site wastewater treatment: Floating constructed wetland integration

被引:24
|
作者
Saeed, Tanveer [1 ]
Afrin, Rumana [2 ]
Al-Muyeed, Abdullah [3 ]
Miah, Md Jihad [1 ]
Jahan, Hasin [4 ]
机构
[1] Univ Asia Pacific, Dept Civil Engn, Dhaka 1205, Bangladesh
[2] United Int Univ, Dept Civil Engn, Dhaka 1212, Bangladesh
[3] Govt Peoples Republ Bangladesh, Dept Publ Hlth Engn, CWIS FSM Support Cell, Dhaka 1000, Bangladesh
[4] WaterAid Bangladesh, Dhaka 1213, Bangladesh
来源
JOURNAL OF ENVIRONMENTAL CHEMICAL ENGINEERING | 2021年 / 9卷 / 04期
关键词
Decentralized treatment; Nutrient; Organic; Polishing step; Septic tank; SUBSURFACE-FLOW; ORGANICS REMOVAL; EMERGENT MACROPHYTES; ANAEROBIC TREATMENT; NITROGEN REMOVAL; PILOT-SCALE; BLACK WATER; TEMPERATURE; PERFORMANCE; PATHOGENS;
D O I
10.1016/j.jece.2021.105606
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
This study reports pollutant removal performance of two on-site wastewater treatment configurations: a fieldscale bioreactor septic tank that received wastewater generated from the washrooms of an educational institute, and a combined pilot-scale bioreactor septic tank, floating constructed wetland system dosed with municipal wastewater. Each bioreactor septic tank was divided into seven compartments: two settling chambers, two anaerobic baffle reactors (ABR), two stone media-packed biowalls, and an effluent collection chamber. Wastewater hydraulic retention time (HRT) in the field and pilot-scale bioreactor septic tanks were 24 and 72 h, respectively. Nitrogen (N), phosphorus (P), organic, and coliform removal percentage in the field-scale bioreactor septic tank were 56%, 76%, 84%, and 88%, respectively. The pilot-scale bioreactor septic tank achieved 93%, 100%, 99.6%, and 99.9% removal, respectively. Pollutant removal in different compartments of the bioreactor septic tanks was achieved through physical, chemical, and microbial degradation pathways. Greater HRT of wastewater in the pilot-scale bioreactor septic tank improved overall removal performance. The floating constructed wetland provided an additional treatment of the pilot-scale bioreactor septic tank effluent; the mean nitrogen and coliform removal percentage was 35% and 91%, respectively. The hanging root-zone (inside the water column) of the floating constructed wetland supported pollutant removal kinetics. This study demonstrates the potential application of the bioreactor septic tank for on-site wastewater treatment and integration of floating constructed wetland as a polishing stage.
引用
收藏
页数:11
相关论文
共 50 条
  • [1] Integration of septic tank and constructed wetland for the treatment of wastewater in Egypt
    Abdel-Shafy, Hussein I.
    El-Khateeb, Mohamed A.
    DESALINATION AND WATER TREATMENT, 2013, 51 (16-18) : 3539 - 3546
  • [2] Nitrogen fate in a subsurface flow constructed wetland for on-site wastewater treatment
    Johns, MJ
    Lesikar, BJ
    Kenimer, AL
    Weaver, RW
    ON-SITE WASTEWATER TREATMENT: PROCEEDINGS OF THE EIGHTH NATIONAL SYMPOSIUM ON INDIVIDUAL AND SMALL COMMUNITY SEWAGE SYSTEMS, 1998, : 237 - 246
  • [3] A small-size vertical flow constructed wetland for on-site treatment of household wastewater
    Gikas, Georgios D.
    Tsihrintzis, Vassilios A.
    ECOLOGICAL ENGINEERING, 2012, 44 : 337 - 343
  • [4] TREATMENT OF SEPTIC TANK SLUDGE IN A VERTICAL FLOW CONSTRUCTED WETLAND SYSTEM
    Andrade, Cynthia F.
    Von Sperling, Marcos
    Manjate, Elias S.
    ENGENHARIA AGRICOLA, 2017, 37 (04): : 811 - 819
  • [5] Nitrification/denitrification potential of a septic tank and a constructed wetland with recirculation in the decentralized wastewater treatment from a housing development
    Decezaro, Samara Terezinha
    Wolff, Delmira Beatriz
    de Araujo, Ronaldo Kanopf
    de Carvalho, Orlando, Jr.
    Sezerino, Pablo Heleno
    ENGENHARIA SANITARIA E AMBIENTAL, 2021, 26 (04) : 721 - 730
  • [6] Combined Industrial Wastewater Treatment in Anaerobic Bioreactor Posttreated in Constructed Wetland
    Zeb, Bibi Saima
    Mahmood, Qaisar
    Jadoon, Saima
    Pervez, Arshid
    Irshad, Muhammad
    Bilal, Muhammad
    Bhatti, Zulfiqar Ahmad
    BIOMED RESEARCH INTERNATIONAL, 2013, 2013
  • [7] The UASB reactor as an alternative for the septic tank for on-site sewage treatment
    Coelho, ALSS
    do Nascimento, MBH
    Cavalcanti, PFF
    van Haandel, AC
    WATER SCIENCE AND TECHNOLOGY, 2003, 48 (11-12) : 221 - 226
  • [8] Performance of a tidal flow constructed wetland used for post-treatment of on-site wastewater in cold climate
    Hamisi, Rajabu
    Renman, Agnieszka
    Renman, Gunno
    Worman, Anders
    Thunvik, Roger
    JOURNAL OF WATER PROCESS ENGINEERING, 2022, 47
  • [9] Performance of an On-Site Wastewater Treatment System Using Reactive Filter Media and a Sequencing Batch Constructed Wetland
    Hamisi, Rajabu
    Renman, Agnieszka
    Renman, Gunno
    SUSTAINABILITY, 2019, 11 (11)
  • [10] On-site treatment of domestic wastewater using a small-scale horizontal subsurface flow constructed wetland
    Gikas, G. D.
    Tsihrintzis, V. A.
    WATER SCIENCE AND TECHNOLOGY, 2010, 62 (03) : 603 - 614