Nutrient removal in a constructed wetland treating aquaculture effluent at short hydraulic retention time

被引:8
|
作者
Dalsgaard, Johanne [1 ]
von Ahnen, Mathis [1 ]
Naas, Christopher [1 ,2 ]
Pedersen, Per Bovbjerg [1 ]
机构
[1] Tech Univ Denmark, DTU Aqua, Aquaculture Sect, DK-9850 Hirtshals, Denmark
[2] Inst Inland Fisheries Potsdam Sacrow, D-14469 Potsdam, Germany
关键词
Recirculating aquaculture; End-of-pipe; Constructed wetland; Hydraulic retention time; Dissolved nutrients; Particulate nutrients; WATER; TEMPERATURE; DENITRIFICATION; PERFORMANCE; BIOFILTERS; SYSTEMS; DESIGN; CARBON; IMPACT; FLOW;
D O I
10.3354/aei00272
中图分类号
S9 [水产、渔业];
学科分类号
0908 ;
摘要
We examined the longitudinal and seasonal removal of dissolved and particulate nutrient components in a free water surface (FWS) constructed wetland treating all the effluent from a commercial recirculating rainbow trout Oncorhynchus mykiss farm. The wetland consisted of a meandering, 0.7 m deep channel with a total FWS area of 5811 m(2), a total hydraulic loading rate (HLR) of 2.23 m d(-1), and a total hydraulic retention time (HRT) of 0.32 d. Bi-weekly, 24 h composite samples were obtained along the wetland for 1 yr and analysed for dissolved and particulate nutrient components. Furthermore, a short sampling campaign assessed the sedimentation of particles (5 to 200 mu m). A first order kinetic plug flow model was fitted to the longitudinal data, and a first set of area-based removal rate constants (k(A)) for this wetland type was derived. Sedimentation led to particulate nutrient removal, but there was no annual net removal of dissolved nutrients aside from an infinitesimal removal of phosphorus. Microbial removal processes were substrate-limited, and removal rate constants followed an annual cycle presumably coupled to available plant surface area and temperature. Denitrification was limited by low carbon availability and high oxygen concentrations, and the wetland became a net producer of nitrate at times due to oxygenation of ammonia. In summary, dissolved nutrients were largely not removed and the wetland was over-dimensioned for particulate nutrient removal. This new insight should be taken into account in future efforts to improve the treatment performance of similar types of aquaculture wetlands operated at short hydraulic retention times.
引用
收藏
页码:329 / 343
页数:15
相关论文
共 50 条
  • [1] Nutrient removal in a slow-flowing constructed wetland treating aquaculture effluent
    Dalsgaard, Johanne
    von Ahnen, Mathis
    Pedersen, Per Bovbjerg
    [J]. AQUACULTURE ENVIRONMENT INTERACTIONS, 2021, 13 : 363 - 376
  • [2] Constructed Wetland for Treating Effluent from Subtropical Aquaculture Farm
    Fernanda Travaini-Lima
    Márcia Andreia Mesquita Silva da Veiga
    Lúcia Helena Sipaúba-Tavares
    [J]. Water, Air, & Soil Pollution, 2015, 226
  • [3] Constructed Wetland for Treating Effluent from Subtropical Aquaculture Farm
    Travaini-Lima, Fernanda
    Mesquita Silva da Veiga, Marcia Andreia
    Sipauba-Tavares, Lucia Helena
    [J]. WATER AIR AND SOIL POLLUTION, 2015, 226 (03):
  • [4] Effect of hydraulic retention time on the treatment of secondary effluent in a subsurface flow constructed wetland
    Ghosh, Deblina
    Gopal, Brij
    [J]. ECOLOGICAL ENGINEERING, 2010, 36 (08) : 1044 - 1051
  • [5] Effects of Hydraulic Retention Time of Aquaculture Effluent on Nutrient Film Technique Lettuce Productivity
    Wallace-Springer, Nathan
    Wells, Daniel E.
    Pickens, Jeremy M.
    Ayipio, Emmanuel
    Kemble, Joseph
    [J]. AGRONOMY-BASEL, 2022, 12 (10):
  • [6] Settling basin design in a constructed wetland using TSS removal efficiency and hydraulic retention time
    Soyoung Lee
    Marla C.Maniquiz-Redillas
    Lee-Hyung Kim
    [J]. Journal of Environmental Sciences, 2014, (09) : 1791 - 1796
  • [7] Settling basin design in a constructed wetland using TSS removal efficiency and hydraulic retention time
    Soyoung Lee
    Marla CManiquizRedillas
    LeeHyung Kim
    [J]. Journal of Environmental Sciences., 2014, 26 (09) - 1796
  • [8] Settling basin design in a constructed wetland using TSS removal efficiency and hydraulic retention time
    Lee, Soyoung
    Maniquiz-Redillas, Marla C.
    Kim, Lee-Hyung
    [J]. JOURNAL OF ENVIRONMENTAL SCIENCES, 2014, 26 (09) : 1791 - 1796
  • [9] Effects of Connection Mode and Hydraulic Retention Time on Wastewater Pollutants Removal in Constructed Wetland Microcosms
    Ren, Li-Jun
    Xu, Li-Li
    Zhang, Yu-Yuan
    Pan, Wei
    Yin, Sheng-Lai
    Zhou, Yan
    Yu, Lu-Ji
    Chen, Yu-Shun
    An, Shu-Qing
    [J]. CLEAN-SOIL AIR WATER, 2015, 43 (12) : 1574 - 1581
  • [10] Assessment of Nutrient Removal in Surface Flow Constructed Wetland Treating Secondary Effluent with Low Organic, Nitrogen and Phosphorus Loads
    El Hanandeh, Ali
    Akrami, Kambez
    [J]. ENVIRONMENTS, 2023, 10 (05)