Two Solvable Cases of Three-machine Production Scheduling with Stochastic Breakdowns

被引:0
|
作者
Li Yang [1 ]
机构
[1] Shenyang Inst Chem Technol, Dept Math & Phys, Shenyang 110142, Peoples R China
关键词
flowshop; machine breakdowns; makespan; algorithm; TIMES;
D O I
暂无
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The problem of scheduling a three-machine production, where machines suffer random breakdowns, is addressed with respect to the makespan objective. For our problem, obtaining an optimal schedule by implicit enumeration techniques (after dominance relations are established) is very hard, mainly due to the total idle time on machine 3. That is because it is the maximum of n terms, each of which includes the difference of two random sums of random variables, and furthermore, the terms are dependent. Two dominance relations for stochastically minimizing makespan are established in the flowshop where machines suffer random breakdowns and processing times of the jobs conform to the conditions. Furthermore, it is shown that algorithm for the deterministic problem stochastically minimizes makespan when random breakdowns are present.
引用
下载
收藏
页码:37 / 42
页数:6
相关论文
共 50 条
  • [1] Three-machine Production Scheduling with Stochastic Breakdowns
    Li Yang
    CCDC 2009: 21ST CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-6, PROCEEDINGS, 2009, : 2647 - 2652
  • [2] A special three-machine production scheduling with Stochastic breakdowns
    Li, Yang
    Zeng, Fanhui
    PROCEEDINGS OF THE 2007 CONFERENCE ON SYSTEMS SCIENCE, MANAGEMENT SCIENCE AND SYSTEM DYNAMICS: SUSTAINABLE DEVELOPMENT AND COMPLEX SYSTEMS, VOLS 1-10, 2007, : 1247 - 1252
  • [3] Sequencing and scheduling in a three-machine robotic cell
    Zahrouni, Wassim
    Kamoun, Hichem
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (10) : 2823 - 2835
  • [4] ASSESSING THE EFFECTS OF MACHINE BREAKDOWNS IN STOCHASTIC SCHEDULING
    BIRGE, JR
    GLAZEBROOK, KD
    OPERATIONS RESEARCH LETTERS, 1988, 7 (06) : 267 - 271
  • [5] A two-stage three-machine assembly scheduling problem with deterioration effect
    Wu, Chin-Chia
    Azzouz, Ameni
    Chung, I-Hong
    Lin, Win-Chin
    Ben Said, Lamjed
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2019, 57 (21) : 6634 - 6647
  • [6] Two- and three-machine flowshop scheduling problems with optional final operation
    Su, Ling-Huey
    Chen, James C.
    JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2011, 28 (01) : 55 - 71
  • [7] Interfering job set scheduling on two-operation three-machine flowshop
    Tuong, Nguyen Huynh
    Soukhal, Ameur
    2009 IEEE-RIVF INTERNATIONAL CONFERENCE ON COMPUTING AND COMMUNICATION TECHNOLOGIES: RESEARCH, INNOVATION AND VISION FOR THE FUTURE, 2009, : 1 - 5
  • [8] On three-machine flow shop scheduling with deteriorating jobs
    Wang, Ling
    Sun, Lin-Yan
    Sun, Lin-Hui
    Wang, Ji-Bo
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2010, 125 (01) : 185 - 189
  • [9] THREE-MACHINE JOB SHOP SCHEDULING WITH INTERMEDIATE TRANSFER
    Li, Y.
    Shi, S. Y.
    Huang, Q. D.
    INTERNATIONAL JOURNAL OF SIMULATION MODELLING, 2018, 17 (02) : 359 - 368
  • [10] EVALUATING THE EFFECTS OF MACHINE BREAKDOWNS IN STOCHASTIC SCHEDULING PROBLEMS
    GLAZEBROOK, KD
    NAVAL RESEARCH LOGISTICS, 1987, 34 (03) : 319 - 335