Simulation Research for the Influence of Mining Sequence on Coal Pillar Stability under Highwall Mining Method

被引:4
|
作者
Huang, Jing [1 ]
Meng, Fanbao [1 ]
Wang, Ge [2 ]
Wu, Yingkui [2 ]
Wen, Jinhao [3 ]
机构
[1] Shandong Univ Sci & Technol, Coll Energy & Min Engn, Qingdao 266590, Shandong, Peoples R China
[2] Taian Taishuo Strata Control Technol Co Ltd, Tai An 271000, Shandong, Peoples R China
[3] China Univ Min & Technol Beijing, Sch Mech & Civil Engn, Beijing 100083, Peoples R China
关键词
DESIGN;
D O I
10.1155/2021/8864339
中图分类号
P3 [地球物理学]; P59 [地球化学];
学科分类号
0708 ; 070902 ;
摘要
Highwall mining, which is referred to the technique of extracting coal from the bottom of an exposed highwall, features safety, efficiency, and economy. According to existing highwall mining methods, the mining sequence has a great influence on highwall stability. Based on a highwall mining project in Australia, this study adopted the FLAC(3D) numerical simulation method to investigate the stability of coal pillars with different mining sequences. The results show that different mining sequences of boreholes exert a great effect on highwall stability. Compared with sequential mining, the skip mining method achieves higher speed of highwall stabilization and smaller plastic zone of coal pillar with its maximum strength decreasing by 12%. By adjusting the mining sequence scientifically, the coal pillar failure and roof collapse caused by the deviation of mining angle can be avoided. The results may provide a new angle for the studies on the coal pillar layout and stability design in highwall mining.
引用
收藏
页数:9
相关论文
共 50 条
  • [1] Study on influence of excavation sequence on the stability of coal pillar under final highwall with auger mining
    Zeng, QB
    Zhang, YJ
    Cheng, GM
    Liu, HY
    [J]. PROGRESS IN SAFETY SCIENCE AND TECHNOLOGY, VOL V, PTS A AND B, 2005, 5 : 1664 - 1669
  • [2] The influence of Auger mining excavation sequence on inter-hole pillar stability below the final highwall of a surface coal mine
    Zeng, Qian-bang
    Cheng, Guo-ming
    Liu, Huan-yu
    [J]. INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 2006, 43 (07) : 1134 - 1138
  • [3] Study on influence of excavation sequence on the stability of coal pillar under final high wall with auger mining
    Zeng, Qian-Bang
    Cheng, Guo-Ming
    Liu, Huan-Yu
    [J]. Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2005, 27 (07): : 768 - 771
  • [4] Numerical investigation into the effect of backfilling on coal pillar strength in highwall mining
    Mo, S.
    Canbulat, I
    Zhang, C.
    Oh, J.
    Shen, B.
    Hagan, P.
    [J]. INTERNATIONAL JOURNAL OF MINING SCIENCE AND TECHNOLOGY, 2018, 28 (02) : 281 - 286
  • [5] The Calculation of Inelastic Zone Width of Coal Pillar in Highwall Mining With Backfill
    Jiang, Juyu
    Lu, Ye
    Cao, Lanzhu
    Wang, Dong
    Wang, Laigui
    Han, Xinping
    Yang, Huiwen
    Jia, Zhengzhao
    [J]. FRONTIERS IN EARTH SCIENCE, 2022, 10
  • [6] Web pillar stability in open-pit highwall mining
    Jiang, Juyu
    Zhang, Zhuowei
    Wang, Dong
    Wang, Laigui
    Han, Xinping
    [J]. INTERNATIONAL JOURNAL OF COAL SCIENCE & TECHNOLOGY, 2022, 9 (01)
  • [7] Web pillar stability in open-pit highwall mining
    Juyu Jiang
    Zhuowei Zhang
    Dong Wang
    Laigui Wang
    Xinping Han
    [J]. International Journal of Coal Science & Technology, 2022, 9
  • [8] Numerical investigation into the effect of backfilling on coal pillar strength in highwall mining
    Mo S.
    Canbulat I.
    Zhang C.
    Oh J.
    Shen B.
    Hagan P.
    [J]. International Journal of Mining Science and Technology, 2018, 28 (02) : 281 - 286
  • [9] Parameter design of coal pillar in highwall mining under action of dynamic-static load
    Jiang, Juyu
    Lu, Ye
    Cao, Lanzhu
    Fu, Tianguang
    Wang, Dong
    Wang, Laigui
    Cai, Mingxiang
    Li, Lei
    [J]. Meitan Kexue Jishu/Coal Science and Technology (Peking), 2023, 51 (05): : 53 - 62
  • [10] Highwall Mining Stability
    Shen, Baotang
    [J]. MINING 2014: TAISHAN ACADEMIC FORUM - PROJECT ON MINE DISASTER PREVENTION AND CONTROL, 2014, : 25 - 37