Implementing a pipeline strategic renovation plan using a MIS (GIS) approach

被引:0
|
作者
Varkevisser, E [1 ]
机构
[1] Rand Water, ZA-2000 Johannesburg, South Africa
关键词
D O I
暂无
中图分类号
TV21 [水资源调查与水利规划];
学科分类号
081501 ;
摘要
it appears that Water Boards/Utilities worldwide focus in their rationale to a selection criteria model on only one or a few parameters to base their decision of whether or not to renovate pipes. Rand Water recognised that it is evident that with state-of-the-art, integrated technology, more accessible and up-to-date information data bases, more complex and innovative selection criteria models will have to he implemented. This is necessary in order to cope with realistic requirements to supply our customers trouble-free in the long term. Rand Water considered two models with the preparation of a 5-year Strategic Renovation Plan (SRP), namely: the multiple queries model and the selection criteria model. The application of these two models to implement the SRP will be discussed.
引用
收藏
页码:522 / 526
页数:5
相关论文
共 50 条
  • [1] IMPLEMENTING THE STRATEGIC PLAN
    Dickman, Bob
    [J]. AEROSPACE AMERICA, 2009, 47 (03) : B5 - B5
  • [2] IMPLEMENTING THE STRATEGIC PLAN
    MACZURA, G
    [J]. AMERICAN CERAMIC SOCIETY BULLETIN, 1992, 71 (06): : 847 - 847
  • [3] IMPLEMENTING A STRATEGIC PLAN
    HOFFMAN, DW
    [J]. JOURNAL OF THE AIR & WASTE MANAGEMENT ASSOCIATION, 1992, 42 (07): : 871 - 871
  • [4] Implementing a maintenance strategic plan using TPM methodology
    Pinto, G.
    Silva, F. J. G.
    Fernandes, N. O.
    Casais, R.
    Baptista, A.
    Carvalho, C.
    [J]. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND MANAGEMENT, 2020, 11 (03): : 192 - 204
  • [5] IMPLEMENTING A STRATEGIC RECRUITMENT AND RETENTION PLAN
    SMELTZER, CH
    TSENG, S
    HARTY, LM
    [J]. JOURNAL OF NURSING ADMINISTRATION, 1991, 21 (06): : 20 - 28
  • [6] Implementing for Results: Your Strategic Plan in Action
    McLean, Michelle
    [J]. AUSTRALIAN LIBRARY JOURNAL, 2011, 60 (01): : 85 - 85
  • [7] IMPLEMENTING FOR RESULTS: YOUR STRATEGIC PLAN IN ACTION
    Lunce, Carol S.
    [J]. TECHNICAL SERVICES QUARTERLY, 2010, 27 (01) : 142 - 143
  • [8] Using GIS based models to plan regional reclaimed water pipeline networks
    Lynch, S
    Martin, K
    Bramwell, D
    [J]. PIPELINES IN THE CONSTRUCTED ENVIRONMENT, 1998, : 80 - 87
  • [9] Strategic Plan Priority 1: Enriching the Applicant Pipeline
    Adams, Jennifer L.
    Law, Anandi
    [J]. AMERICAN JOURNAL OF PHARMACEUTICAL EDUCATION, 2017, 81 (01)
  • [10] A Model for Evaluating the Performance of the Strategic Plan Using an Analytic Approach
    Eshlaghy, A. Toloie
    Radfar, R.
    Kivi, M. Bahrampour
    [J]. IEEM: 2008 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-3, 2008, : 455 - +