Modelling of hybrid moving bed biofilm reactors: a pilot plant experiment

被引:13
|
作者
Mannina, G. [1 ]
Di Trapani, D. [1 ]
Torregrossa, M. [1 ]
Viviani, G. [1 ]
机构
[1] Univ Palermo, Dipartimento Ingn Idraul & Applicaz Ambientali, I-90128 Palermo, Italy
关键词
hybrid moving bed biofilm reactor; MBBR; model nitrification; organic carbon removal; pilot scale;
D O I
10.2166/wst.2007.264
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
In recent years there has been an increasing interest in the development of hybrid biofilm reactors, especially in the upgrading of existing WWTP that are no longer able to respect concentration limits. In fact, today's challenge is the achievement of a good aquatic state for the receiving water bodies according to the Water Framework Directive requirements, which indeed limit even more the continuous emissions, i.e. coming from WWTP. This paper presents the setting up of a mathematical model for the simulation of a hybrid MBBR system; the model calibration/validation has been carried out considering a field gathering campaign on an experimental pilot plant. The main goal is to gain insight about MBBR processes attempting to overcome main shortcomings in particular referring to the modelling aspects. The model is made up of two connected sub-models for the simulation of the suspended and attached biomass. The model is mainly based on the concepts of the activated sludge model No. 1 (ASM1) for the description of the biokinetic process both for the suspended and for the attached biomass. The results show a good agreement between predicted and observed values both for the attached and for the suspended biomass moreover they are encouraging for further researches.
引用
收藏
页码:237 / 246
页数:10
相关论文
共 50 条
  • [1] Hybrid moving bed biofilm reactors: a pilot plant experiment
    Di Trapani, D.
    Mannina, G.
    Torregrossa, M.
    Viviani, G.
    [J]. WATER SCIENCE AND TECHNOLOGY, 2008, 57 (10) : 1539 - 1545
  • [2] Modelling and dynamic simulation of hybrid moving bed biofilm reactors: Model concepts and application to a pilot plant
    Mannina, Giorgio
    Di Trapani, Daniele
    Viviani, Gaspare
    Odegaard, Hallvard
    [J]. BIOCHEMICAL ENGINEERING JOURNAL, 2011, 56 (1-2) : 23 - 36
  • [3] Pilot-plant experiments with moving-bed biofilm reactors
    Pastorelli, G
    Andreottola, G
    Canziani, R
    Frangipane, ED
    DePascalis, F
    Gurrieri, G
    Rozzi, A
    [J]. WATER SCIENCE AND TECHNOLOGY, 1997, 36 (01) : 43 - 50
  • [4] Comparison between hybrid moving bed biofilm reactor and activated sludge system: a pilot plant experiment
    Di Trapani, Daniele
    Mannina, Giorgio
    Torregrossa, Michele
    Viviani, Gaspare
    [J]. WATER SCIENCE AND TECHNOLOGY, 2010, 61 (04) : 891 - 902
  • [5] Hybrid moving bed biofilm reactors: an effective solution for upgrading a large wastewater treatment plant
    Mannina, Giorgio
    Viviani, Gaspare
    [J]. WATER SCIENCE AND TECHNOLOGY, 2009, 60 (05) : 1103 - 1116
  • [6] Modelling Nitrification of a Lagoon Effluent in Moving-Bed Biofilm Reactors
    Houweling, Dwight
    Monette, Frederic
    Millette, Louise
    Comeau, Yves
    [J]. WATER QUALITY RESEARCH JOURNAL OF CANADA, 2007, 42 (04): : 284 - 294
  • [7] Pilot testing and preliminary design of moving bed biofilm reactors for nitrogen removal at the FREVAR wastewater treatment plant
    Rusten, B
    Hellström, BG
    Hellström, F
    Sehested, O
    Skjelfoss, E
    Svendsen, B
    [J]. WATER SCIENCE AND TECHNOLOGY, 2000, 41 (4-5) : 13 - 20
  • [8] Modelling of moving bed biofilm membrane reactors (MBBMR) for on-site greywater treatment
    Jabornig, Simon
    Rauch, Wolfgang
    [J]. WATER SCIENCE AND TECHNOLOGY, 2015, 71 (08) : 1180 - 1188
  • [9] Evaluating the effect of biofilm thickness on nitrification in moving bed biofilm reactors
    Piculell, Maria
    Welander, Pia
    Jonsson, Karin
    Welander, Thomas
    [J]. ENVIRONMENTAL TECHNOLOGY, 2016, 37 (06) : 732 - 743
  • [10] Design and operations of the Kaldnes moving bed biofilm reactors
    Rusten, B
    Eikebrokk, B
    Ulgenes, Y
    Lygren, E
    [J]. AQUACULTURAL ENGINEERING, 2006, 34 (03) : 322 - 331