Bridge life cycle assessment with data uncertainty

被引:35
|
作者
Zhang, Yu-Rong [1 ]
Wu, Wen-Jie [1 ]
Wang, Yuan-Feng [1 ]
机构
[1] Beijing Jiaotong Univ, Sch Civil Engn, Beijing 100044, Peoples R China
来源
关键词
Bridge; Data uncertainty; Life cycle assessment; Monte Carlo simulation; Probability distribution; Sensitivity analysis; SENSITIVITY; FRAMEWORK; MODEL; LCA;
D O I
10.1007/s11367-016-1035-7
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Although life cycle assessment (LCA) has been employed to analyze the environmental impacts of bridges, the uncertainties associated to LCA have not been studied, which have a profound effect on the LCA results. This paper is intended to provide a comprehensive environmental impact assessment of bridge with data uncertainty, by assigning probability distributions on the considered parameters, assessing the variability in the acquisition of inventory and identifying the key parameters with significant environmental impacts. A life cycle assessment of a bridge in Shanxi Province of China was conducted in a cradle-to-grave manner, by considering the source of the uncertainty of LCA. A statistical method was applied to quantify the uncertainty of measured inventory data and to calculate the probability distribution of the data. The uncertainty propagation was conducted through using a Monte Carlo simulation. Finally, the factor which is of vital importance to the assessment result was identified by sensitivity analysis. For the case of bridge, normal distribution can be adopted to fit environmental substances and environmental impact in steel production. The distributions of the weighted value of human health damage, ecological system damage, and resource and energy consumption can be represented by an approximate similar normal distribution function. The coefficient of variance (COV) of each weighted value is about 40, 30 to 40, and about 6 %, respectively. The COV for the total environmental impact is about 10 % in all stages of the bridge's life cycle, except the operation stage, which is up to 22.67 %. By conducting sensitivity analysis, PM10, NOx, and oil consumption was found to have a great influence on the result of human health damage, ecological system damage, and resource and energy consumption, respectively. The COV for the total environmental impact is 22.67 % in the bridge's operation stage; it is important to establish a reasonable maintenance strategy to decrease the uncertainty of the bridge's environmental impact. The COVs of the weighted value for human health damage and resource and energy consumption have a quite modest difference among the four stages of the bridge's life cycle. However, The COV of the weighted value for ecological system damage shows large difference among the four stages of the bridge's life cycle; construction stage has the greatest uncertainty. In addition, different values of PM10, NOx, and oil consumption have a profound influence on the result of human health damage, ecological system damage, and resource and energy consumption, respectively.
引用
收藏
页码:569 / 576
页数:8
相关论文
共 50 条
  • [1] Bridge life cycle assessment with data uncertainty
    Yu-Rong Zhang
    Wen-Jie Wu
    Yuan-Feng Wang
    [J]. The International Journal of Life Cycle Assessment, 2016, 21 : 569 - 576
  • [2] Data quality: Assessing input data uncertainty in life cycle assessment inventory models
    Kennedy D.J.
    Montgomery D.C.
    Rollier D.A.
    Keats J.B.
    [J]. The International Journal of Life Cycle Assessment, 1997, 2 (4) : 229 - 239
  • [3] Uncertainty in Life-Cycle Assessment Induced by Life-Cycle Inventory Data: The Case of Structural Steel
    Zygomalas, Iordanis
    Baniotopoulos, Charalambos
    [J]. ENGINEERING JOURNAL-AMERICAN INSTITUTE OF STEEL CONSTRUCTION, 2013, 50 (02): : 117 - 128
  • [4] Uncertainty analysis and impact on seismic life-cycle cost assessment of highway bridge structures
    Shekhar, S.
    Ghosh, J.
    [J]. LIFE-CYCLE ANALYSIS AND ASSESSMENT IN CIVIL ENGINEERING: TOWARDS AN INTEGRATED VISION, 2019, : 923 - 930
  • [5] A new inventory data model and method for uncertainty evaluation in life cycle assessment
    Sugiyama, H
    [J]. PROCEEDINGS OF THE INTERNATIONAL WORKSHOP ON QUALITY OF LIFE CYCLE INVENTORY (LCI) DATA, 2004, 6941 : 28 - 33
  • [6] UNCERTAINTY OF THE LIFE CYCLE ASSESSMENT OF BIOGAS POWER
    Alberto Huerta-Reynoso, Enrique
    Alfredo Lopez-Aguilar, Hector
    Guadalupe Gomez-Mendez, Maria
    Alberto Gomez, Jorge
    Perez-Hernandez, Antonino
    [J]. REVISTA INTERNACIONAL DE CONTAMINACION AMBIENTAL, 2022, 38 : 271 - 287
  • [7] Methods for uncertainty propagation in life cycle assessment
    Groen, E. A.
    Heijungs, R.
    Bokkers, E. A. M.
    de Boer, I. J. M.
    [J]. ENVIRONMENTAL MODELLING & SOFTWARE, 2014, 62 : 316 - 325
  • [8] UNCERTAINTY OF THE LIFE CYCLE ASSESSMENT OF BIOGAS POWER
    Alberto Huerta-Reynoso, Enrique
    Alfredo Lopez-Aguilar, Hector
    Guadalupe Gomez-Mendez, Maria
    Alberto Gomez, Jorge
    Perez-Hernandez, Antonino
    [J]. REVISTA INTERNACIONAL DE CONTAMINACION AMBIENTAL, 2022, 38 : 271 - 287
  • [9] Parameterization in Life Cycle Assessment inventory data: review of current use and the representation of uncertainty
    Cooper, Joyce Smith
    Noon, Michael
    Kahn, Ezra
    [J]. INTERNATIONAL JOURNAL OF LIFE CYCLE ASSESSMENT, 2012, 17 (06): : 689 - 695
  • [10] Representing and visualizing data uncertainty in input-output life cycle assessment models
    Chen, Xiaoju
    Griffin, W. Michael
    Matthews, H. Scott
    [J]. RESOURCES CONSERVATION AND RECYCLING, 2018, 137 : 316 - 325