The ERP Project Risk Assessment - A case study

被引:0
|
作者
Iskanius, Paivi [1 ]
机构
[1] Univ Oulu, Raahe Unit, Oulu, Finland
关键词
Enterprise resource planning; risk analysis method; characteristics analysis method; small and medium sized enterprise; MANAGEMENT; INNOVATION;
D O I
暂无
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
Information and communication (ICT) technology related projects, such as enterprise resource planning (ERP) projects have a high failure rate. Planned and systematically adopted risk management procedure is crucial to keep projects on time and within budget with all requirements fulfilled. In this paper, we have analysed the critical risks of ERP projects through the case study of three manufacturing small and medium size enterprises (SMEs). First, by using company-specific risk analysis method, the critical risks of the ERP projects have been identified and assessed. Second, by using characteristics analysis method, the recommendations of how to divide the ERP projects into manageable sub projects have been given.
引用
收藏
页码:752 / 756
页数:5
相关论文
共 50 条
  • [1] A Risk Assessment Model for Evaluating ERP Projects: a Case Study
    Wu Jianhong
    [J]. PROCEEDINGS OF THE 6TH EURO-ASIA CONFERENCE ON ENVIRONMENT AND CSR: SOCIETY AND TOURISM MANAGEMENT SESSION, PT II, 2010, : 8 - 13
  • [2] Risk Assessment Method of ERP Project Based on Risk Matrix and AHP
    Yang, Xiaoping
    Zhuang, Qiaojuan
    He, Miao-Hua
    [J]. PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON RISK AND RELIABILITY MANAGEMENT, VOLS I AND II, 2008, : 473 - 476
  • [3] ERP Project Implementing Personnel Case Study
    Zhang Yuesheng
    [J]. MEMS, NANO AND SMART SYSTEMS, PTS 1-6, 2012, 403-408 : 305 - 308
  • [4] Study of Risk Control of ERP Project Based on ERM
    Zhang Yuesheng
    [J]. MEMS, NANO AND SMART SYSTEMS, PTS 1-6, 2012, 403-408 : 1601 - 1604
  • [5] Project management: a case study of a successful ERP implementation
    Carton, Fergal
    Adam, Frederic
    Sammon, David
    [J]. INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS, 2008, 1 (01) : 106 - 124
  • [6] Raissy Changing Project: a case study of implementing ERP
    Hamani, N.
    Mouawad, P.
    Kermad, L.
    El Mhamedi, A.
    [J]. 2012 IEEE INTERNATIONAL CONFERENCE ON CONTROL SYSTEM, COMPUTING AND ENGINEERING (ICCSCE 2012), 2012, : 524 - 529
  • [7] Risk Assessment in ERP Project by COPRAS Method Under Fuzzy Environment
    Nigam, Mukesh Kumar
    Avikal, Shwetank
    Ram, Mangey
    [J]. INTERNATIONAL JOURNAL OF RELIABILITY QUALITY AND SAFETY ENGINEERING, 2021, 28 (06)
  • [8] Analyzing the risk of ERP project:: a case study of XJ group (ID: 2-088)
    Li Wen
    Zhou Xia
    Zeng Ping
    Du Shuai
    [J]. PROCEEDINGS OF THE 13TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-5: INDUSTRIAL ENGINEERING AND MANAGEMENT INNOVATION IN NEW-ERA, 2006, : 916 - 922
  • [9] The Importance of Risk Assessment in the Context of Investment Project Management: a Case Study
    Bernadete Junkes, M.
    Tereso, Anabela P.
    Afonso, Paulo S. L. P.
    [J]. CONFERENCE ON ENTERPRISE INFORMATION SYSTEMS/INTERNATIONAL CONFERENCE ON PROJECT MANAGEMENT/CONFERENCE ON HEALTH AND SOCIAL CARE INFORMATION SYSTEMS AND TECHNOLOGIES, CENTERIS/PROJMAN / HCIST 2015, 2015, 64 : 902 - 910
  • [10] Uncertainty Management to Coordinate and Control an ERP Project: A Case Study
    Marinho, Marcelo
    Macedo, Karina
    Santos, Simone
    Beecham, Sarah
    [J]. 2018 11TH INTERNATIONAL CONFERENCE ON THE QUALITY OF INFORMATION AND COMMUNICATIONS TECHNOLOGY (QUATIC), 2018, : 295 - 296