The return of drilling fluid in large diameter horizontal directional drilling boreholes

被引:21
|
作者
Shu, Biao [1 ]
Ma, Baosong [2 ]
机构
[1] Cent S Univ, Sch Geosci & Info Phys, Changsha 410083, Hunan, Peoples R China
[2] China Univ Geosci, Sch Engn, Wuhan 430074, Hubei, Peoples R China
关键词
Horizontal directional drilling; Drilling fluid; Drilling mud pressure; Mud return; Reaming; HDD PULL LOADS; PIPE;
D O I
10.1016/j.tust.2015.11.002
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The return of drilling fluid (drilling mud) in large diameter horizontal directional drilling (HDD) boreholes is a very important issue related to mud pressure, cuttings transport and pull back force, but this problem has not been fully solved in previous research due to the complexity and uncertainty of downhole conditions. The calculation methods of mud pressure loss in the borehole annulus are briefly introduced and the equation using a Power Law model is adopted to study the drilling mud return. A typical reaming hierarchy of a large diameter HDD project has been used to study the return direction of drilling mud and volumes of drilling mud return to the exit and entry points. The research results disclosed that the drilling mud can return to both exit and entry points at the same time, with a large majority of the drilling fluid returning to the exit point if the reamer is closer to the exit point, and vice versa. A parametric study has been conducted to find out the effect of changing parameters in the calculation equation on the drilling fluid return. The drilling mud return for those boreholes with the exit point and entry point located at different elevations has also been discussed. Finally, different types of reamers and other factors such as borehole collapse and borehole shape were taken into the consideration of drilling mud return. (C) 2015 Elsevier Ltd. All rights reserved.
引用
收藏
页码:1 / 11
页数:11
相关论文
共 50 条
  • [1] Drilling fluid considerations in design of engineered horizontal directional drilling installations
    Baumert, Michael E.
    Allouche, Erez N.
    Moore, Ian D.
    [J]. International Journal of Geomechanics, 2005, 5 (04) : 339 - 349
  • [2] On-grade large diameter directional drilling
    Currey, John
    Woodbridge, Gene
    Duyvestyn, Glenn
    [J]. NASTT/ISTT International No-Dig Conference and Show 2009, including the Annual Technical Conference of North American Society for Trenchless Technology, No-Dig 2009, 2009, 2 : 831 - 839
  • [3] Development of annular pump to enhance drilling distance and cuttings return in horizontal directional drilling
    Shetty, Rakshith
    Samaniuk, Joseph
    Mooney, Michael
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2023, 140
  • [4] Theoretical Analysis of Drilling Fluid Flow for Maxi-Horizontal Directional Drilling
    Wang, Zhiyu
    Hu, Changming
    Li, Liang
    Yang, Chao
    Liang, Hui
    [J]. JOURNAL OF PIPELINE SYSTEMS ENGINEERING AND PRACTICE, 2024, 15 (04)
  • [5] Horizontal directional drilling
    Bardsley, David
    [J]. Water Well Journal, 2002, 56 (07):
  • [6] Flow Properties of Fresh Mud (Drilling Fluid) Used in Horizontal Directional Drilling
    Yan, Xuefeng
    Lan, Haitao
    Moore, Ian D.
    Ma, Baosong
    [J]. JOURNAL OF PIPELINE SYSTEMS ENGINEERING AND PRACTICE, 2021, 12 (01)
  • [7] Research on the Influence of Boulder on the Drilling Performance of Large Diameter Horizontal Drilling Machine
    Zheng, Dong
    Liu, Weihua
    Huang, Da
    Zhang, Xiaojing
    [J]. Journal of Railway Engineering Society, 2021, 38 (09) : 48 - 53
  • [8] Numerical Investigation of the Circumferential Stresses around Boreholes during Horizontal Directional Drilling
    Lan, Haitao
    Moore, Ian D.
    [J]. INTERNATIONAL JOURNAL OF GEOMECHANICS, 2017, 17 (12)
  • [9] Impact of mechanical tripping on cuttings transport in large-diameter horizontal directional drilling applications
    Huang, Sheng
    Kang, Chao
    Bayat, Alireza
    Heath, Kent
    Trovato, Cainan
    Osbak, Manley
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2021, 117
  • [10] INCREASING THE EFFICIENCY OF REACTIVE TURBINE-UNIT DRILLING OF LARGE DIAMETER BOREHOLES
    IOANNESYAN, RA
    RYBALKA, AA
    [J]. NEFTYANOE KHOZYAISTVO, 1990, (11): : 29 - 34