Restoration strategies for the South China interconnected power system after generator tripping following DC system fault

被引:0
|
作者
Cheng, G. H. [1 ]
Xu, Z. [1 ]
Chao, J. [2 ]
机构
[1] Zhejiang Univ, Dept Elect Engn, Hangzhou 310027, Peoples R China
[2] Guizhou Elect Power Com, Guiyang, Peoples R China
基金
美国国家科学基金会;
关键词
power system stability; restoration; generator tripping; user-written model; simulation; South China; interconnected power system;
D O I
10.1109/TDC.2006.1668656
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
When such severe contingency as double pole block fault arouses instability in the South China Interconnected Power System (SCIPS), selective tripping of generating units in the sending end has to be used as a method to maintain system stability. In case the tripped units go through a shutdown and cold start cycle for long duration, it is desirable that they should be hot started and resynchronized to the system as soon as possible to make a quick recovery of the system after fault. Under conditions where the DC fault is permanent, however, such objective is difficult to achieve. This paper presents a control strategy that power generation of some running units be reduced during this process to permit the tripped units to be resynchronized to the system without changing the power level at the sending end, which enables the tripped units to be restored to load rapidly without disturbing system stability. With user models developed in PSS/E, simulations were performed on the SCIPS to investigate the system behavior during reloading process of those thermal units which had been tripped following DC block fault. The results show that power generation at the sending end can be maintained at a reasonable steady level when output of some running units are appropriately reduced during the reloading process of the thermal units, thus having little impact on the system stability, which demonstrates the feasibility and effectiveness of the proposed scheme.
引用
收藏
页码:1095 / +
页数:2
相关论文
共 50 条
  • [1] Grid-Adaptive Equivalencing of Power System for Generator Tripping
    Min, Daham
    Hur, Kyeon
    Kim, Seog-Joo
    2014 IEEE PES GENERAL MEETING - CONFERENCE & EXPOSITION, 2014,
  • [2] A Novel Method to Estimate the System Damping After Generator Tripping
    Bin, Zi-Jun
    Liu, Yun
    Hao, Si-Peng
    Zhu, Xin-Yao
    Kong, Xiang-Ping
    Wang, Ming-Shen
    JOURNAL OF ELECTRICAL ENGINEERING & TECHNOLOGY, 2023, 18 (02) : 843 - 855
  • [3] A Novel Method to Estimate the System Damping After Generator Tripping
    Zi-Jun Bin
    Yun Liu
    Si-Peng Hao
    Xin-Yao Zhu
    Xiang-Ping Kong
    Ming-Shen Wang
    Journal of Electrical Engineering & Technology, 2023, 18 : 843 - 855
  • [4] Analysis of inter-area oscillations in the South China Interconnected Power System
    Liu, GP
    Xu, Z
    Huang, Y
    Pan, WL
    ELECTRIC POWER SYSTEMS RESEARCH, 2004, 70 (01) : 38 - 45
  • [5] Interconnected power system laboratory: Fault analysis experiment
    Carullo, SP
    Bolkus, R
    Hartle, J
    Foy, J
    Nwankpa, CO
    Fischl, R
    Gillerman, J
    IEEE TRANSACTIONS ON POWER SYSTEMS, 1996, 11 (04) : 1913 - 1919
  • [6] Prevention of sympathetic tripping phenomena on power system by fault level management
    Agili, B. Othman
    AL-Ziz, Abdu M. Mamdoh
    Yossif, H. Kamal
    2008 IEEE/PES TRANSMISSION & DISTRIBUTION CONFERENCE & EXPOSITION, VOLS 1-3, 2008, : 852 - 865
  • [7] Hydro and Gas Turbine Blackout Restoration Strategies in the South Korean Power System
    Lee, Sang-Seung
    2014 IEEE PES GENERAL MEETING - CONFERENCE & EXPOSITION, 2014,
  • [9] Studies of Fault Protection Strategies Aiming to DC System with DC Converter
    Zhao, Yue
    Shi, Libao
    Yao, Liangzhong
    Wang, Zhibing
    Yang, Bo
    2015 IEEE POWER & ENERGY SOCIETY GENERAL MEETING, 2015,
  • [10] Dynamic stability index of generator and its application to interconnected power system
    Chen, Houhe
    Jiang, Tao
    Li, Guoqing
    Zhang, Ruiyang
    Dianli Zidonghua Shebei/Electric Power Automation Equipment, 2012, 32 (01): : 34 - 39