Improvement of Industrial Production Process Design Using Systematic Layout Planning

被引:0
|
作者
Fafandjel, Niksa [1 ]
Rubesa, Rajko [2 ]
Matulja, Tin [1 ]
机构
[1] Univ Rijeka, Fac Engn, Teh Fak Sveucilista & Rijeci, HR-51000 Rijeka, Croatia
[2] Brodogradiliste 3 Maj Shipyard 3 Maj, HR-51000 Rijeka, Croatia
来源
STROJARSTVO | 2009年 / 51卷 / 03期
关键词
Pipe workshop; Production process design; Shipbuilding; Systematic layout planning (SLP); SEMICONDUCTOR FABRICATION FACILITIES;
D O I
暂无
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
Modern industrial production processes, including also shipbuilding processes, are expected to deliver products or interim products on time with acceptable price and required quality. For instance, production of pipe units in shipbuilding industry that use conventional methods, characterized by high content of human work per pipe unit, cannot satisfy these requirements. To increase productivity it is necessary to introduce CNC machines and robotized lines that will also enhance production process capacity. Accordingly, optimal machines layout to ensure production and technological process with maximal capacity potential should be defined, Therefore, for production process design improvement, the employment of Systematic layout planning proceure is proposed. SLP procedure is used for defining optimal machines and jobs layout within the production process. Improvement of production process design using proposed procedure has been tested through basic design for new pipe production workshop within a particular shipyard.
引用
收藏
页码:177 / 186
页数:10
相关论文
共 50 条
  • [1] Production layout improvement by using line balancing and Systematic Layout Planning (SLP) at PT. XYZ
    Buchari
    Tarigan, U.
    Ambarita, M. B.
    [J]. TALENTA - CONFERENCE ON ENGINEERING, SCIENCE AND TECHNOLOGY 2017 (TALENTA-CEST 2017), 2018, 309
  • [2] Design and Simulation Plant Layout Using Systematic Layout Planning
    Suhardini, D.
    Septiani, W.
    Fauziah, S.
    [J]. 10TH INTERNATIONAL SEMINAR ON INDUSTRIAL ENGINEERING AND MANAGEMENT: SUSTAINABLE DEVELOPMENT IN INDUSTRY AND MANAGEMENT, 2017, 277
  • [3] Multi-floor Facility Layout Improvement Using Systematic Layout Planning
    Hosseini, S. S.
    Wong, K. Y.
    Mirzapour, S. A.
    Ahmadi, R.
    [J]. MATERIALS, INDUSTRIAL, AND MANUFACTURING ENGINEERING RESEARCH ADVANCES 1.1, 2014, 845 : 532 - 537
  • [4] Productivity improvement of a manufacturing facility using systematic layout planning
    Naqvi, Syed Asad Ali
    Fahad, Muhammad
    Atir, Muhammad
    Zubair, Muhammad
    Shehzad, Muhammad Musharaf
    [J]. COGENT ENGINEERING, 2016, 3 (01):
  • [5] Layout improvement of railway workshop using systematic layout planning (SLP) ? A case study
    Khariwal, Shubham
    Kumar, Pradeep
    Bhandari, Manish
    [J]. MATERIALS TODAY-PROCEEDINGS, 2021, 44 : 4065 - 4071
  • [6] Production Floor Layout Using Systematic Layout Planning in Can Manufacturing Company
    Singh, Ajit Pal
    Yilma, Manderas
    [J]. 2013 INTERNATIONAL CONFERENCE ON CONTROL, DECISION AND INFORMATION TECHNOLOGIES (CODIT), 2013, : 822 - 828
  • [7] Application of design of experiments for industrial paint production process improvement
    Chutima, Parames
    Suksamran, Apisada
    [J]. 6TH INTERNATIONAL CONFERENCE ON MANUFACTURING, OPTIMIZATION, INDUSTRIAL AND MATERIAL ENGINEERING : MOIME18, 2018, 2044
  • [8] Facility layout improvement in sewing department with Systematic Layout planning and ergonomics approach
    Suhardi, Bambang
    Juwita, Eldiana
    Astuti, Rahmaniyah Dwi
    [J]. COGENT ENGINEERING, 2019, 6 (01):
  • [9] The Application of Systematic Layout Planning in General Layout of Burner Production Systems
    Fei, Yizheng
    Wang, Huifen
    [J]. 2011 3RD WORLD CONGRESS IN APPLIED COMPUTING, COMPUTER SCIENCE, AND COMPUTER ENGINEERING (ACC 2011), VOL 3, 2011, 3 : 132 - 137
  • [10] Consideration of layout in product design and process planning
    Adil, GK
    [J]. ADVANCES IN CONCURRENT ENGINEERING: CE96: COLLABORATIVE WORK ORGANIZATION AND MANAGEMENT PRODUCT AND PROCESS INTEGRATION PLANNING AND SCHEDULING INFORMATION AND PROCESS MODELING DATA EXCHANGE PRACTICAL APPLICATIONS, 1996, 96 : 251 - 255