Study on the Technology of Middle Column in Li-Jia-Ping Station of Chongqing Metro Line No.9

被引:0
|
作者
Yao, Zaifeng [1 ]
Guo, Xiaohong [1 ]
Chao, Feng [1 ]
机构
[1] China State Construct Tech Ctr, Beijing, Peoples R China
关键词
Extra-large section; Septal column method; Bearing capacity; Monitoring measurement; Numerical simulation;
D O I
10.1088/1755-1315/283/1/012045
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In order to study the construction technology of the underground excavation station of Chongqing where the geological conditions of the surrounding rock are better, Li-jia-ping Station of Chongqing rail transit line 9 is selected as the engineering background. On the basis of the traditional double sidewall tunnel method, the middle column method is proposed. Through the numerical simulation analysis of the variation of the tunnel dome subsidence, the horizontal displacement of the surrounding rock, and the plasticity of the surrounding rock under the construction of the spacer column method, the result shows that the construction of the middle pillar can satisfy the vault of Li-jia-ping station according to the field monitoring measurement data. Subsidence and surface subsidence control requirements. The research results can provide references for the design and construction of subway stations with large cross-section excavation under similar conditions.
引用
收藏
页数:6
相关论文
共 1 条
  • [1] Key Technologies for One-Time Installation of Super-Long Pipe Sheds in Tunnel Support Construction: A Case Study on Songhuai Youyuan Station (Line 9) in Zhengzhou Metro
    Sun, Lijuan
    Zhao, Qilong
    Liu, Lianjie
    Ma, Liyong
    Zhou, Kehang
    Lin, Yunhong
    Ouyang, Maolin
    [J]. BUILDINGS, 2024, 14 (07)